Tax credit for solar PV in businesses
In 2026 the strongest tax credit for a business is the ZES unica one: up to 70% of the investment, but only in the assisted areas of the South and of Abruzzo, Marche and Umbria, with a project of at least 200,000 euros and a final percentage set by the Agenzia delle Entrate. Solar PV is not excluded, but no official document deals with it specifically. Transizione 5.0 is closed: for new systems anywhere in Italy there is enhanced depreciation.
Updated on official sources checked
3
incentives open today
30 September 2028
next deadline: Enhanced depreciation 2026-2028
up to 70%
ZES unica credit for small businesses in the Puglia areas covered by the Just Transition Fund, before the reduction
5 of 6
entries checked against official sources
All the incentives at a glance
Each row takes you to its section. Greyed-out entries are being checked: we show what is missing and no figures.
6 incentives shown
| Incentive | Who can claim it | How much | Closes | Status |
|---|---|---|---|---|
| ZES unica tax credit for southern Italy 2026-2028 | Businesses with a production facility in the assisted areas of the ZES unica | Up to 70%, then cut in proportion to demand | 31 December 2028 | Open |
| ZLS tax credit - Simplified logistics zones 2026-2028 | Businesses with a production facility in a ZLS, in the «c» areas only | The maximum intensity in the Regional Aid Map, reduced in proportion to demand | 31 December 2028 | Open |
| Transizione 5.0 tax credit (2024-2025) | Only businesses that already applied by the end of 2025 | Closed. For those left out: 89.77% of the credit on 4.0 assets, a separate grant for the solar PV | 31 December 2025 | Closed |
| 4.0 tax credit for farming, fishing and aquaculture businesses (2026-2028) | Farming, fishing and aquaculture businesses that cannot use enhanced depreciation | 40% for investments up to 1 million euros | 28 September 2028 | Opening soon |
| ZES unica tax credit for farming, fishing and aquaculture businesses (2026) | — | Being checked | — | Being checked |
| Enhanced depreciation 2026-2028 (Nuovo Piano Transizione 5.0) | Businesses with business income | 180% of the cost up to 2.5 million euros | 30 September 2028 | Open |
The incentives in detail
Open an entry for requirements, steps, documents and mistakes to avoid. Every entry carries its official sources at the end.
OpenTax reliefZES unica tax credit for southern Italy 2026-2028
If your business invests in a production facility inside the ZES unica (southern Italy plus Abruzzo, Marche and Umbria, in the assisted areas only), you can get a tax credit of up to 70% of the investment: that is the maximum, for small businesses in the Puglia areas covered by the Just Transition Fund. The percentage you will actually use is set by the Agenzia delle Entrate once it has counted all the applications for the year.Worth: Up to 70%, then cut in proportion to demandCloses: 31 December 2028Show the details
Investments up to 31 December 2028. For 2027 investments the report is filed between 31 March and 30 May 2027; the one for 2026 closed on 30 May 2026.
Who can claim it
- All businesses, whatever their legal form and accounting regime, already trading or setting up in the ZES unica.
- What counts is where the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) is, not the registered office: a business based outside the ZES can claim the credit for a plant inside it.
- Regions: Basilicata, Calabria, Campania, Molise, Puglia, Sardegna, Sicilia, Abruzzo, Marche and Umbria, only in the assisted areas set out in the 2022-2027 Regional Aid Map.
- Retail can apply: it is not among the excluded sectors.
Who is excluded
- Businesses in energy generation, storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.), transmission and distribution and in energy infrastructure. What counts is the ATECO business activity code of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) where you invest.
- The steel, coal and lignite industries; broadband; the banking, financial and insurance sectors.
- Transport and its infrastructure. Warehousing and transport support services, on the other hand, are eligible.
- Primary agricultural producers and fisheries and aquaculture businesses: they have a separate ZES credit.
- Businesses in liquidation, being wound up, or in difficulty under the European rules.
- Projects with a total cost below 200,000 euros.
How much it is worth
- Small businesses, projects up to 50 million euros: 60% in Campania, Puglia, Calabria and Sicilia; 50% in Basilicata, Sardegna and Molise; 35% in Abruzzo, Marche and Umbria (non-predefined «c» areas).
- Small businesses in the Just Transition Fund areas: 70% in Puglia, 60% in Sardegna.
- Medium-sized businesses, projects up to 50 million euros: 50% in Campania, Puglia, Calabria and Sicilia; 40% in Basilicata, Sardegna and Molise; 25% in Abruzzo, Marche and Umbria; 60% in the Puglia areas covered by the Just Transition Fund.
- Large businesses: 40% in Campania, Puglia, Calabria and Sicilia; 30% in Basilicata, Sardegna and Molise; 15% in Abruzzo, Marche and Umbria; 50% in the Puglia areas covered by the Just Transition Fund.
- Maximum eligible investment: 100 million euros per project. Minimum investment: 200,000 euros.
- Reduction: the credit you actually use is the credit accrued multiplied by a percentage that the Agenzia delle Entrate publishes after the supplementary reports. The percentage is the ratio between the year's funds and the total credits claimed.
- Funds available: 2,300 million euros for 2026, 1,000 million for 2027, 750 million for 2028.
- In past years the percentage was 100% in 2024 and 60.3811% in 2025. The 2026 figure will be published within ten days of the deadline for the supplementary reports on 17 January 2027.
Eligible costs
- New machinery, plant and equipment used in a production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) inside the ZES unica, including on a finance lease (what counts is the cost paid by the leasing company, excluding maintenance).
- Purchase of land and purchase, construction or extension of business premises, provided land and buildings do not exceed 50% of the eligible investment.
- The investments must be part of an initial investment project (the definition is in EU regulation 651/2014, article 2, points 49, 50 and 51).
- Goods held for resale, consumables and purchases between linked or controlled businesses are not eligible.
Requirements for solar PV
- A solar PV system is new «plant»: it can enter the credit only if it is part of an initial investment project for the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) inside the ZES unica.
- No official document from the Agenzia delle Entrate or the ZES Authority deals specifically with solar PV for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.). If the project consists of the solar PV system alone, ask your accountant for confirmation or file a formal ruling request with the Agenzia before ordering.
- If the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) has an energy-generation ATECO code, you are excluded: a business whose main activity is selling the energy it produces cannot use it.
- The system must enter service by the second tax period after the purchase and stay in the facility for at least five tax periods, otherwise the credit is reduced.
Combining it with other incentives
- With de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) aid and other State aid on the same costs: yes, provided the total does not exceed the maximum aid intensity set by the European rules for that area.
- With measures that are not State aid: yes, within the limits of the cost actually incurred.
- With enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.): the 2026 budget act allows it only if the two forms of aid do not cover the same shares of the cost and do not exceed the cost incurred; the uplift is also calculated net of grants received for the same costs. We found no specific official clarification on ZES plus enhanced depreciation: have your accountant confirm the calculation.
How to apply
- 1Check the area and the sector. Check that the municipality of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) is in an assisted area of the ZES unica and that the facility's ATECO code is not among those excluded.
- 2Do not commit too early. Only projects started after the measure came into force are eligible. The start is the first legally binding commitment to order the assets.
- 3Report to the Agenzia delle Entrate. For 2027 investments you file the report between 31 March and 30 May 2027, with the costs already incurred and those planned up to 31 December 2027. Only the Agenzia's free software may be used, either directly or through an authorised intermediary.
- 4Supplementary report. On pain of forfeiture, between 3 and 17 January of the following year you confirm the investments made, with the electronic invoices, the credit accrued and the details of the auditor's certificate. The amount cannot exceed the one in the first report. For 2026 investments the window runs from 3 to 17 January 2027.
- 5Use the credit on an F24 form. You offset it on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form only after the order setting the percentage and after the Agenzia's second receipt, and you report it in your tax returns until you have used it all.
Documents
- Electronic invoices for the investments.
- A certificate from a statutory auditor listed in section A of the auditors' register, certifying the costs incurred.
- The lease contract, if the system is on a finance lease.
- The ATECO code of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) where you invest.
Mistakes that cost you the benefit
- Skipping the supplementary report in January: everything is lost.
- Working out the return on the full 60% or 70%: the credit is multiplied by the Agenzia's percentage, which in 2025 was 60.3811%.
- Filing a project below 200,000 euros.
- Moving or selling the system within five tax periods, or closing the business in the ZES less than five years after completion.
- Taking it for granted that a solar PV system on its own counts as an initial investment.
Example: on an investment of 1,000,000 euros
A small business in Campania invests 1,000,000 euros in an eligible project carried out in 2027. The credit accrued is 60%. The credit it will actually use depends on the percentage the Agenzia publishes in early 2028: the rows show two cases already seen in past years.
| Credit accrued (60%) | 600,000 euros |
|---|---|
| With a percentage of 100% (as in 2024) | 600,000 euros |
| With a percentage of 60.3811% (as in 2025) | 362,287 euros |
Official sources
- Agenzia delle Entrate — Scheda «Credito d'imposta per investimenti nella ZES unica (ZES 2026) - Che cos'è», aggiornata al 30 gennaio 2026
- Agenzia delle Entrate — Scheda ZES 2026 - Come e quando
- Struttura di missione ZES - Dipartimento per il Sud — Pagina «Credito di imposta»: tabella delle intensità per regione e dimensione d'impresa
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 438-443 e comma 431
- Normattiva — D.L. 19 settembre 2023, n. 124, art. 16, testo vigente
- Agenzia delle Entrate — FAQ ZES unica dell'11 luglio 2024: settori, codice ATECO, sede legale
- Agenzia delle Entrate — Risposta a interpello n. 169/2026: principio di incentivazione
- Agenzia delle Entrate — Provvedimento prot. n. 56564/2026: percentuale 2025 pari al 60,3811%
Checked on 19 November 2026
OpenTax reliefZLS tax credit - Simplified logistics zones 2026-2028
This is a tax credit similar to the ZES unica one, for businesses investing in the Simplified Logistics Zones (ZLS) listed by the Agenzia delle Entrate in Veneto, Emilia-Romagna, Liguria, Toscana, Lombardia, Friuli-Venezia Giulia and Lazio. It applies to investments from 1 January 2026 to 31 December 2028, at the maximum rate allowed by the Regional Aid Map for that area, reduced in proportion to demand.Worth: The maximum intensity in the Regional Aid Map, reduced in proportion to demandCloses: 31 December 2028Show the details
For 2027 investments the report is filed between 31 March and 30 May 2027; the one for 2026 closed on 30 May 2026. Supplementary reports are filed from 3 to 17 January of the following year.
Who can claim it
- Businesses investing in existing or new production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) inside an established Simplified Logistics Zone.
- Only in the parts of the ZLS eligible for regional aid (areas under article 107(3)(c) of the EU Treaty).
- ZLS listed by the Agenzia delle Entrate: Veneto - Port of Venezia-Rodigino, Emilia-Romagna, Port and Hinterland of Genova, Toscana, Lombardia, Friuli-Venezia Giulia, Lazio, Port and Hinterland of La Spezia (the last from 19 January 2026).
- The list of eligible municipalities is on the website of the Department for Cohesion Policies.
Who is excluded
- Projects with a total cost below 200,000 euros.
- The parts of a ZLS outside the areas eligible for regional aid.
How much it is worth
- The credit is equal to the maximum rate allowed by the 2022-2027 Regional Aid Map for the area where the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) stands.
- Maximum eligible investment: 100 million euros per project. Minimum: 200,000 euros.
- Funds: 100 million euros for each of the years 2026, 2027 and 2028.
- The credit you actually use is the credit accrued multiplied by a percentage published by the Agenzia delle Entrate: the year's funds divided by the credits claimed. If demand is below the funds available, the percentage is 100%.
Eligible costs
- Purchase of capital assets for existing or new production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in the ZLS.
Requirements for solar PV
- No official document we read deals specifically with solar PV in the ZLS: the same cautions as for the ZES unica apply. Ask for confirmation before filing a project consisting of the system alone.
Combining it with other incentives
- With de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) aid and other State aid on the same costs: yes, within the maximum intensity set by the European rules.
- With measures that are not State aid: yes, within the limits of the spend incurred.
How to apply
- 1Check the municipality. Check on the website of the Department for Cohesion Policies that the municipality, or the part of it, is in the ZLS and in the eligible areas.
- 2Report to the Agenzia delle Entrate. For 2027 investments you file it between 31 March and 30 May 2027, with the costs incurred and those planned up to 31 December 2027, using the Agenzia's free software.
- 3Supplementary report. On pain of forfeiture, between 3 and 17 January of the following year you confirm the investments made, with the details of the auditor's certificate.
Documents
- Invoices for the investments.
- A certificate of the costs issued by an auditor listed in section A of the auditors' register.
Mistakes that cost you the benefit
- Taking it for granted that the whole ZLS is eligible: only the «c» areas of the Regional Aid Map count.
- Skipping the supplementary report in January: the credit is lost.
Official sources
- Agenzia delle Entrate — Scheda «ZLS 2026 - Che cos'è», aggiornata al 23 marzo 2026
- Agenzia delle Entrate — Scheda «ZLS 2026 - Come e quando»
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 444-447
Checked on 19 November 2026
ClosedTax reliefTransizione 5.0 tax credit (2024-2025)
It is closed: it covered investments from 1 January 2024 to 31 December 2025, and on 6 November 2025 the MIMIT announced that the funds had run out. For new solar PV systems in businesses the measure today is enhanced depreciation. Those left out for lack of funds have a separate route: for solar PV and storage, a MIMIT grant, no longer the credit.Worth: Closed. For those left out: 89.77% of the credit on 4.0 assets, a separate grant for the solar PVCloses: 31 December 2025Show the details
Applications are closed. The residual credit at 89.77% is used on an F24 form by 31 December 2026; the grant for the solar PV is spread over 2026, 2027 and 2028.
Who can claim it
- New applications can no longer be filed: the deadlines have passed.
- Businesses that sent the completion report and received confirmation from the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) that the investment is technically eligible, but were left out because the funds ran out.
Who is excluded
- Anyone who did not file the reports on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) platform by the end of 2025.
- Investments made from 1 January 2026: enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) applies to those.
How much it is worth
- Businesses left out because the funds ran out: a tax credit equal to 89.77% of the one claimed, but only for 4.0 assets (annexes A and B to law 232/2016) and for staff training. It must be used on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form by 31 December 2026, tax code 7079.
- For the solar PV and storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) part of those same businesses the credit no longer exists: in its place there is a MIMIT grant, in proportion to the spending on systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), storage and certifications. Funds: 57.7 million euros for 2026, 80 million for 2027, 60 million for 2028.
- The grant for the solar PV cannot exceed the credit that had been claimed for the same costs, and it is not taxed.
- How it worked: a credit of 35% to 45% up to 10 million euros of investment, depending on the energy saving achieved.
Eligible costs
- For the residual credit at 89.77%: only tangible and intangible 4.0 assets and staff training.
- For the MIMIT grant: systems generating renewable electricity for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.), and the costs of the accounting, energy-saving and DNSH (Do No Significant Harm to the environment) certifications.
Requirements for solar PV
- The grant covers only businesses that already had a Transizione 5.0 project judged technically eligible by the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.).
- The system must comply with the DNSH principle.
Combining it with other incentives
- The Transizione 5.0 credit cannot be combined with the Transizione 4.0 credit on the same assets.
- With the ZES unica credit the 2025 budget act allowed combination, provided the two forms of aid do not cover the same shares of the cost.
How to apply
- 1Check the GSE platform. If you had an eligible project, from 29 April 2026 you will find the receipt with the confirmed credit in your file on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Transizione 5.0 platform, with a notice by certified email and email.
- 2Use the credit by the end of 2026. The credit at 89.77% is offset on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form by 31 December 2026 with tax code 7079.
- 3Grant for the solar PV. It is paid by the MIMIT on the basis of the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s information on the spending incurred, in the manner set by a ministerial decree: follow the notices published on the MIMIT website.
Documents
- Keep the certifications, sworn reports, invoices and delivery notes for the eligible assets for inspections.
- Tell the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) about sales of the assets, moves to other premises or a lease not exercised within the five years after completion.
Mistakes that cost you the benefit
- Thinking you can still book Transizione 5.0 for a new system: for investments from 2026 there is enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.).
- Letting the credit at 89.77% lapse: after 31 December 2026 it can no longer be offset.
Official sources
- MIMIT — Pagina «Piano Transizione 5.0»: chiusura, decreto direttoriale 6 novembre 2025 (esaurimento risorse), ultima modifica 30 giugno 2026
- MIMIT — Avviso 29 aprile 2026: credito all'89,77%, uso entro il 31 dicembre 2026, codice tributo 7079
- Normattiva — D.L. 27 marzo 2026, n. 38, art. 8, commi 1, 3 e 3-bis (testo vigente)
- GSE — Pagina Transizione 5.0: risorse esaurite
Checked on 19 November 2026
Opening soonTax relief4.0 tax credit for farming, fishing and aquaculture businesses (2026-2028)
The 2026 budget act provides for a 40% tax credit, for investments up to 1 million euros, for farming, fishing and aquaculture businesses buying 4.0 assets. It is not designed for solar PV: it covers only the assets in annexes IV and V. And to use it a decree from the Ministry of Agriculture is needed which, as at 19 November 2026, we did not find published.Worth: 40% for investments up to 1 million eurosCloses: 28 September 2028Show the details
Investments from 1 January 2026 to 28 September 2028. To apply, the implementing decree from the Ministry of Agriculture (paragraph 459) is needed: as at 19 November 2026 we did not find it on the official websites.
Who can claim it
- Businesses active in the primary production of agricultural products and in fishing and aquaculture.
- Only if they can use neither enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) nor the 2026 agricultural ZES credit: the law excludes investments made by anyone who can benefit from those measures.
Who is excluded
- Investments by anyone who can use enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) (paragraphs 427-436 of the 2026 budget act).
- Investments by anyone who can use the 2026 ZES unica credit for agriculture (paragraphs 462-465).
- Investments that already benefit from article 1, paragraph 446, of law 207/2024.
How much it is worth
- 40% of the cost for investments up to 1 million euros.
- Funds: 2.1 million euros for each of the years 2026, 2027 and 2028. The procedures for staying within the funds are set by the implementing decree.
- It can only be used by offsetting on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form, from the year after the one in which the cost was incurred.
- For businesses not required to have a statutory audit, the cost of the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) is added to the credit, up to 5,000 euros.
Eligible costs
- New tangible and intangible capital assets listed in annexes IV and V to the 2026 budget act (4.0 assets), bought between 1 January 2026 and 28 September 2028.
- Also on a finance lease: what counts is the cost paid by the leasing company.
Requirements for solar PV
- Annex IV does not name solar PV. The only entry that comes close concerns «smart systems and solutions for energy management», including the generation of energy used solely for the production process.
- Renewable energy systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) are, in the law, a separate category provided for only under enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.). A solar PV system on its own therefore does not appear to be covered by this credit: ask for confirmation before counting on it.
Combining it with other incentives
- It can be combined with other aid on the same costs, provided the total does not exceed the cost incurred.
- It cannot be combined with the 2026 ZES unica credit for agriculture, according to the Agenzia delle Entrate.
How to apply
- 1Wait for the implementing decree. The Ministry of Agriculture, together with the MIMIT and the Ministry of the Economy, must set the rules and award procedures by decree. Until then there is no form to file.
- 2Prepare correct invoices. Invoices, delivery notes and other purchase documents must expressly cite paragraphs 454 to 459 of law no. 199 of 30 December 2025.
- 3Have the costs certified. An accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) from a statutory auditor is required; if you are not subject to an audit, you ask for it from an auditor listed in section A of the register.
Documents
- Invoices and delivery notes citing paragraphs 454-459 of law 199/2025.
- Accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) from a statutory auditor.
- The lease contract, if the asset is on a finance lease.
Mistakes that cost you the benefit
- Invoices without the reference to paragraphs 454-459: you risk losing the credit.
- Counting on this credit for a solar PV system: the law does not list it.
- Using it when you can already have enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) or the agricultural ZES credit: in those cases it is excluded.
- Selling the asset or not exercising the lease by 31 December of the fifth year after completion: the credit is reduced.
Official sources
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 454-459 e Allegato IV
- Agenzia delle Entrate — Scheda ZES agricoltura 2026: non cumulabilità con il credito dei commi 454-459
Checked on 19 November 2026
ZES unica tax credit for farming, fishing and aquaculture businesses (2026)
This is the ZES credit reserved for farming, forestry, fishing and aquaculture businesses. For 2026 it covered investments made up to 15 November 2026: anyone who sent the first report by 30 May 2026 must send the final report between 20 November and 2 December 2026.
What is missing: We did not find the credit percentages in the ministerial decree, nor any official source saying whether a solar PV system is eligible. For new investments it is closed in any case: it applied to purchases up to 15 November 2026.
Source to check: Agenzia delle EntrateGazzetta Ufficiale
OpenTax reliefEnhanced depreciation 2026-2028 (Nuovo Piano Transizione 5.0)
You can deduct from income tax more than you spent: the cost of a solar PV system for self-consumption is uplifted by 180% on the portion up to 2.5 million euros. It applies to systems completed between 1 January 2026 and 30 September 2028.Worth: 180% of the cost up to 2.5 million eurosCloses: 30 September 2028Show the details
System completed (work finished) by 30 September 2028; completion report by 15 November 2028.
Who can claim it
- Anyone with business income who invests in assets used in production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in Italy: resident businesses and permanent establishments of foreign businesses, whatever their legal form, sector or size.
- Farms: what counts is how you determine your income. The law refers to «persons with business income»; those who cannot use enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) have a dedicated agricultural tax credit (see the Agriculture page).
Who is excluded
- Businesses in voluntary liquidation, bankruptcy, compulsory administrative liquidation, composition with creditors without business continuity or any other insolvency procedure, even where it is only being declared.
- Businesses subject to disqualifying sanctions (legislative decree 231/2001).
- For those who qualify, the benefit applies only if they comply with workplace safety rules and pay their employees' social contributions correctly.
How much it is worth
- 180% on the portion of the investment up to 2.5 million euros.
- 100% on the portion above 2.5 and up to 10 million euros.
- 50% on the portion above 10 and up to 20 million euros.
- It is not a tax credit to be used on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form: it is an extra (off-book) deduction on depreciation charges (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) or lease instalments, which reduces the taxable base for income tax only.
- The benefit starts from the tax year in which you file the completion report with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.), if the system entered service in that same year and after the GSE checks have come back positive.
Eligible costs
- The electricity generating units (modules and system components).
- The transformers upstream of the grid connection point and the meters for the energy produced.
- The system's auxiliary services.
- The storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.) connected to the installation, up to a ceiling: 2 times the eligible value of the system up to 20 kW, 1.5 times up to 600 kW, 1.2 times up to 1,000 kW, 1 time above that.
- Each system has a maximum eligible cost, set by the decree by size and by module type (Annex 1): spending above that ceiling is not uplifted.
Requirements for solar PV
- The energy produced must serve the business's own consumption, including at a distance.
- The system may produce at most 105% of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s energy needs, calculated on the average annual consumption of the previous year. Those needs also include gas or other fuels used for heat, converted with the formulas in the decree.
- The system stands on the same land-registry parcels as the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.), or on different parcels if it is connected to the grid through an existing POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.) (the code of the delivery point) of the same facility.
- Modules: for solar, only systems with modules listed in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) of photovoltaic technologies, section b) or section c), qualify (article 12 of decree-law 181/2023). The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) platform only provides these two fields.
- Section b): modules with cells made in the European Union, with cell efficiency of at least 23.5%. Section c): modules made in the European Union with bifacial heterojunction or tandem cells made in the European Union, with cell efficiency of at least 24.0%.
Combining it with other incentives
- You can add it to other national or European incentives on the same costs, provided the support does not cover the same shares of the cost and the total does not exceed the cost incurred.
- The uplift is calculated on the cost net of other grants received for the same costs: for example, if a regional call covers part of the spend, the 180% applies only to the rest.
- It does not apply to investments using the deduction in article 1, paragraph 446, of law 207/2024.
- Text read in the original version of the law in the Official Gazette: later amendments (decree-law 38/2026) are being checked.
How to apply
- 1Get your consumption figures ready. Collect the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s electricity (and heat) consumption for the previous year and the POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.): they are needed to show that the system does not exceed 105% of the facility's needs.
- 2Advance report. On the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s «Nuovo Piano Transizione 5.0» portal (Customer Area, with SPID or CIE) you book the benefit: details of the business and of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.), the expected amount, the expected dates for finishing the work and entering service. The platform has been open since 12 June 2026.
- 3Confirmation report. Within 60 days of a positive outcome on the advance report you confirm the investment, with the date and amount of the payment that brings the down payment to at least 20% of the cost of each asset, and the invoice details. You cannot add assets and the costs can only go down.
- 4Completion report. Once the system is in service, and in any case by 15 November 2028, you file the completion report with the invoices and declare that you hold the sworn technical report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.) and the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.).
- 5Annual reports. From the first report and for as long as the benefit lasts: a periodic report by 20 January each year, and by 30 June the supplement with the depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) schedule.
Documents
- Annual electricity consumption (and any heat consumption) of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in the previous year.
- Invoices for the eligible costs and proof of payment of the down payment of at least 20%.
- A sworn technical report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.) by an engineer or industrial surveyor on the professional register, or a certificate from an accredited certification body.
- Accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) by a statutory auditor (including for businesses not required to have an audit).
- Registration of the modules in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) (section b or c).
- The lease contract and the purchase order, if the system is on a finance lease.
Mistakes that cost you the benefit
- Counting on the 180% for the part of the spend already covered by a grant: the uplift is calculated net of other grants on the same costs.
- Sizing the system above 105% of your needs: the excess part does not qualify.
- Ordering modules not listed in sections b) or c) of the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.).
- Missing a deadline (60 days for the confirmation, 10 days for supplements, 15 November 2028 for the completion): the benefit is lost.
- Thinking it is a credit to offset on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form: it is a deduction from income tax, and you need taxable profits.
- Selling the system or moving it abroad during the depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) period without replacing it with a similar asset: the benefit is forfeited.
- Not keeping the sworn report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.), the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.), the invoices and the delivery notes for inspections.
Example: on an investment of 100,000 euros
A solar PV system for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), completed in 2027, with an eligible cost of 100,000 euros. With the 180% uplift the business deducts 280,000 euros in all instead of 100,000, spread over the years of depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.). The real saving is the extra deduction multiplied by the income tax rate you pay: work it out with your accountant.
| Eligible cost | 100,000 euros |
|---|---|
| 180% uplift | +180,000 euros |
| Total deductible | 280,000 euros |
| On 3,000,000 euros | +4,500,000 (180% on 2.5 million) +500,000 (100% on 0.5 million) |
Official sources
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 427, 428, 429 e 431 (testo originario)
- MIMIT — Scheda «Nuovo Piano Transizione 5.0 - Iperammortamento», aggiornata al 15 ottobre 2026
- GSE — Nuovo Piano Transizione 5.0: chi può accedere, calcolo del beneficio, come accedere
- MIMIT-MEF — Decreto interministeriale 7 maggio 2026, artt. 3, 4, 6, 7, 8, 10 e Allegato 1
- GSE — Guida all'utilizzo della piattaforma NPTR5 (15 ottobre 2026), sezione impianti FER
- Normattiva — Decreto-legge 9 dicembre 2023, n. 181, art. 12, comma 1 (Registro ENEA dei moduli)
Checked on 19 November 2026
Which sectors it applies to
- Manufacturing
The typical ZES unica case: a plant in an assisted area and a project above 200,000 euros. It is better to include solar PV in a wider investment project, because no official source clarifies whether a system on its own counts as an initial investment.
- Retail and hospitality
Retail and hospitality are not among the sectors excluded from ZES unica: a business whose premises are in an assisted area can apply with projects of at least 200,000 euros.
- Logistics and warehouses
Transport is excluded from ZES unica, but warehousing and transport support services are eligible. In the simplified logistics zones (ZLS) of Veneto, Emilia-Romagna, Liguria, Toscana, Lombardia, Friuli-Venezia Giulia and Lazio there is the ZLS credit, with similar rules.
- Agriculture
Primary agricultural producers are excluded from ZES unica and have a ZES credit of their own, closed for purchases after 15 November 2026. The 40% 4.0 credit in the 2026 budget act does not list solar PV and is still waiting for its implementing decree.
- Apartment buildings
Does not apply: these tax credits go to businesses, for assets used in production facilities. Apartment buildings have the deductions on shared parts and energy communities instead.
- Public bodies
Does not apply: ZES unica, ZLS and Transizione 5.0 are reserved for businesses. Public bodies have other routes, such as Conto Termico and energy communities.
Frequently asked questions
Does solar PV qualify for the ZES unica tax credit?
The credit covers new systems used in a production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) inside the ZES unica, provided they are part of an initial investment project. No official document from the Agenzia delle Entrate deals with solar PV specifically: if the project is just the system, ask for confirmation through a formal ruling or from your accountant before ordering.
Is it true that I can get back 70% of the investment?
70% is the top of the table: it applies only to small businesses in the Puglia areas identified for the Just Transition Fund, with projects up to 50 million euros. The credit is then multiplied by the percentage the Agenzia delle Entrate publishes once it has counted the applications: in 2025 it was 60.3811%, in 2024 it was 100%.
Can I still apply for ZES on 2026 investments?
Only if you filed the report by 30 May 2026. In that case you must send the supplementary report between 3 and 17 January 2027, or you lose the credit. For 2027 investments the report is filed between 31 March and 30 May 2027.
Can ZES unica and enhanced depreciation be added together?
The ZES credit can be combined with other aid within the European limits. The enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) act allows combining only if the two forms of aid do not cover the same share of the cost, and it calculates the uplift net of any grants received for the same costs. There is no specific official clarification: have your accountant do the sums.
Is Transizione 5.0 still open?
No. It covered investments up to 31 December 2025 and MIMIT announced that the funds were exhausted on 6 November 2025. Applicants left out who had an eligible project receive 89.77% of the credit on 4.0 assets, to be used by 31 December 2026, and for solar PV a separate MIMIT grant.
Can an apartment building or a municipality use these credits?
No. ZES unica, ZLS and Transizione 5.0 are for businesses investing in production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.). Apartment buildings and public bodies have other incentives: you will find them on their own pages.
Updates
The Agenzia delle Entrate updates its guidance on the 2026 ZES credit for agriculture: investments up to 15 November 2026, final report between 20 November and 2 December 2026.
Transizione 5.0: the GSE starts sending confirmations of the credit at 89.77% (on 4.0 assets) to businesses left out when the funds ran out. For solar PV and storage the law provides a separate MIMIT grant.
The Agenzia delle Entrate approves the reporting forms for the ZES unica and ZLS credits for 2026-2028.
The 2026 budget act extends the ZES unica credit to 31 December 2028 and widens the ZES to the assisted areas of Marche and Umbria.
Related pages
- Apartment buildings5 openupd. 19 November 2026
- Public bodies2 openupd. 19 November 2026
- Retail and hospitality7 openupd. 19 November 2026
- Agriculture3 openupd. 19 November 2026
- Manufacturing6 openupd. 19 November 2026
- Logistics and warehouses6 openupd. 19 November 2026
- Enhanced depreciation1 openupd. 19 November 2026
- Regional grants7 openupd. 19 November 2026
Work out what the tax credit gives your business back
Sofia sizes the system around your consumption, applies the incentives you are entitled to and puts you in touch with 2-3 installers. Free of charge.
The information on this page is guidance, current at the date shown and based on the official sources cited. It does not replace the opinion of an accountant or an adviser: before committing to an investment, check your own case with a professional.