Regional grants for solar PV, region by region

Regional grants for solar PV differ from one Region to another and stay open for only a few weeks. As at 19 November 2026 we checked every Region and Autonomous Province: here you will find the calls that are open, the ones announced and the ones closed over the last twelve months, and where each Region publishes its calls.

Updated on official sources checked

Try:
  • 7

    incentives open today

  • 30 November 2026

    next deadline: Emilia-Romagna - Fondo Energia

  • 21

    Regions and Autonomous Provinces checked

  • 19 of 26

    entries checked against official sources

Each row takes you to its section. Greyed-out entries are being checked: we show what is missing and no figures.

Status
Type

26 incentives shown

Summary table of the incentives: incentive, who can claim it, how much it is worth, closing date, status
IncentiveWho can claim itHow muchClosesStatus
Calabria - FEERI, Energy Efficiency and Renewables Fund for BusinessesCalabriaMicro, small, medium-sized and large businesses with an operating site in CalabriaUp to 100% of the investment: a loan at 1% plus a grant of up to 35%30 December 2026Open
Emilia-Romagna - Grants for renewable energy community systems (2025 call)Emilia-Romagna—Being checked—Being checked
Emilia-Romagna - Fondo EnergiaEmilia-RomagnaBusinesses of every size and ESCosLoan of up to 1 million euros, 75% interest-free30 November 2026Open
Emilia-Romagna - Solar PV on car park canopies (renewables in businesses)Emilia-RomagnaIndividual SMEsUp to 35% non-repayable, maximum 100,000 euros16 November 2026Closed
Friuli Venezia Giulia - Grants for renewable energy community systems (2026)Friuli Venezia Giulia—Being checked—Being checked
Friuli Venezia Giulia - Solar PV on farm buildings of agricultural SMEs (2026 call)Friuli Venezia GiuliaAgricultural SMEs with an operating unit in the region40% for the solar PV, 100% to replace asbestos roofs31 May 2026Closed
Friuli Venezia Giulia - Grants for solar PV in manufacturing, services and construction businessesFriuli Venezia GiuliaManufacturing, services and construction businesses of every sizeFrom 30% to 50% non-repayable, maximum 500,000 euros per business30 September 2026Closed
Lazio - Energia Solare per le ImpreseLazioBusinesses of every size with an operating site in LazioUp to 65% for the solar PV, maximum 1 million euros per business31 March 2026Closed
Liguria - Energy efficiency and renewables in public buildings (fourth call)LiguriaProvinces, the Metropolitan City, municipalities of up to 40,000 residents and other bodiesUp to 70% non-repayable (80% for small municipalities), maximum 1 million euros30 September 2026Closed
Liguria - Energy efficiency and renewables in public buildings (fifth call)LiguriaProvinces, the Metropolitan City, municipalities of up to 40,000 residents and other bodiesUp to 70% non-repayable (80% for small municipalities), maximum 1 million euros24 November 2026Closed
Lombardia - Investimenti, Impresa efficiente strandLombardiaSMEs with an operating site in LombardiaNon-repayable grant of up to 45% for renewables, plus a free guarantee on the loanno closing dateOpen
Marche - Charging points with solar PV for public bodies (ERDF 2021-2027)Marche—Being checked—Being checked
Marche - Renewable Energy Communities call (ERDF 2021-2027)MarcheRenewable energy communities (CER) based in Marche40% of the investment, up to 300,000 euros29 January 2027Open
Piemonte - Renewable energy in businesses 2026PiemonteBusinesses in Piemonte of every sizeUp to 100% of the costs: subsidised loan plus a non-repayable share of 10% to 30%27 November 2026Closed
Puglia - New call for energy community systems (announced)Puglia—Being checked—Being checked
Puglia - Energy communities in the province of Taranto (JTF 2021-2027)PugliaPublic bodies, publicly owned companies and SMEs in the province of Taranto that are members of a CER40% of the spend, up to 500,000 euros per proposal30 November 2026Open
Sardegna - First come, first served call on Energy Efficiency and Renewable Energy 2025SardegnaMicro, small and medium-sized businesses in Sardegna in certain sectorsUp to 65% for renewables, from 20,000 to 500,000 euros31 July 2026Closed
Sicilia - «Sicilia efficiente: meno consumi, più futuro» callSiciliaMicro, small and medium-sized businesses with a production unit in Sicilia60% for micro and small businesses, 50% for medium-sized ones12 February 2026Closed
Province of Bolzano - Provincial grants 2026 for renewable energy (businesses, apartment buildings, public bodies)Autonomous Province of BolzanoSmall businesses, apartment buildings, local authorities, non-profit bodiesFrom 20% to 80% depending on the applicant and the work31 May 2026Closed
Province of Trento - Energia allo Sviluppo call 2026Autonomous Province of Trento—Being checked—Being checked
Umbria - Renewable Sources call 2026 (reported)Umbria—Being checked—Being checked
Valle d'Aosta - Systems for energy communities, measure for legal entitiesValle d'AostaCERs and legal entities that are members of oneUp to 40% of the spend13 November 2026Closed
Valle d'Aosta - Energy efficiency in businesses (ERDF)Valle d'AostaIndustrial and craft businessesFrom 30% to 50% non-repayable (60% under de minimis)31 December 2026Open
Valle d'Aosta - Grants for solar PV for individuals and apartment buildingsValle d'AostaIndividuals and apartment buildings40% non-repayable, up to 16,800 euros per application30 September 2027Open
Veneto - Renewable energy systems in energy communities (CER 2 call)VenetoCERs, municipalities and public administrations40% non-repayable, up to 300,000 euros5 February 2026Closed
Veneto - Solar PV and storage for SMEs in the Distretti del Commercio (reported)Veneto—Being checked—Being checked

Region by region

For each Region and Autonomous Province: what we found, when we checked, and where the Region publishes its calls.

The incentives in detail

Open an entry for requirements, steps, documents and mistakes to avoid. Every entry carries its official sources at the end.

Autonomous Province of Bolzano

ClosedNon-repayable grant· Autonomous Province of Bolzano

Province of Bolzano - Provincial grants 2026 for renewable energy (businesses, apartment buildings, public bodies)

Applications for 2026 closed on 31 May 2026. The Autonomous Province of Bolzano gives non-repayable grants for solar PV: 20% (25% with non-Chinese components) to small businesses, 30% to local authorities, up to 80% to apartment buildings that combine it with renovating the building or with a heat pump. The application must be filed between 1 January and 31 May of the year the work starts.Worth: From 20% to 80% depending on the applicant and the workCloses: 31 May 2026
Show the details

For 2026 applications ran from 1 January to 12 noon on 31 May. The provincial rules set the same window every year (from 1 January to 31 May of the year the work starts), but the 2027 conditions should be checked again.

Who can claim it

  • Small businesses, for solar PV systems up to 100 kWp in all (counting those already supported in 2023, 2024 and 2025).
  • Local authorities and their consortia, accredited social service facilities, non-profit bodies in local authority buildings, land reclamation consortia: up to 200 kWp a year.
  • Apartment buildings, for shared solar PV as part of an energy renovation or combined with a heat pump.
  • Businesses of every size, for heat pumps combined with solar PV.

How much it is worth

  • Solar PV for small businesses: 20%; 25% if modules, cells, inverters and batteries are not of Chinese origin.
  • Solar PV for local authorities: 30%; 50% for accredited social services; 15% for administrations receiving environmental funds from large hydroelectric abstractions.
  • Shared solar PV as part of an energy renovation (CasaClima B or R, apartment buildings with at least 5 units and 5 owners): 80%.
  • Heat pump with solar PV: 60% small, 50% medium-sized, 40% large business; 80% apartment buildings with at least 5 units and 5 owners, 60% other apartment buildings; 20% public administrations; 60% non-profit bodies.
  • Batteries alone for existing systems: 20% small businesses, 30% apartment buildings, public and non-profit bodies.
  • Minimum investment: 4,000 euros, excluding VAT. Costs are counted up to the ceilings in the provincial criteria.

Eligible costs

  • Solar PV systems.
  • Storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) batteries of up to 1 kWh per kWp of the system's capacity.
  • Greening the roof in the area the panels occupy.

Requirements for solar PV

  • The system serves to cover annual electricity needs, including through self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) at a distance.
  • Buildings with planning permission granted before 1 January 2025.
  • Work within the territory of the province of Bolzano.

Combining it with other incentives

  • It cannot be combined on the same costs with other state or provincial grants, tax deductions included. The exceptions for public administrations and for energy community (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) premium tariffs are preserved.

How to apply

  1. 1Authorisation on myCIVIS. Businesses and public bodies need an electronic authorisation approved by the office: request it well in advance.
  2. 2Application before the work. You file a separate application for each applicant on the myCIVIS portal, before starting the work, with a revenue stamp.
  3. 3Assessment. The office examines applications in chronological order within 180 days, until the funds run out.
  4. 4Payment. Once the work is paid for, you claim payment on myCIVIS by 31 December of the year after the award.

Documents

  • Works form and technical sheet on the provincial templates.
  • A detailed cost estimate, professional costs included.
  • For apartment buildings: a list of the owners with their shares and status (individual, business, body).

Mistakes that cost you the benefit

  • Starting the work, signing contracts with a deposit or paying invoices before the application: for businesses the application is rejected (except under the «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» regime).
  • Invoices without the CUP code notified by the office.
  • Selling the building or ceasing trading within 5 years of payment: the grant is withdrawn proportionally.

Official sources

Checked on 19 November 2026

Autonomous Province of Trento

Being checkedNon-repayable grant· Autonomous Province of Trento

Province of Trento - Energia allo Sviluppo call 2026

Call open until 30 November 2026. The Autonomous Province of Trento funds business investments that cut energy costs; we are checking whether and when it covers solar PV systems.

What is missing: The text of the call lists solar PV systems both among the possible investments and in a list of «non-eligible» costs: we have not yet established whether and in which cases solar PV is funded.

Source to check: Provincia autonoma di Trento – scheda del bandoProvincia autonoma di Trento – testo coordinato del bando

Calabria

OpenSubsidised loan· Calabria

Calabria - FEERI, Energy Efficiency and Renewables Fund for Businesses

Open until 30 December 2026, unless the funds run out first. The Regione Calabria funds up to 100% of businesses' investment in energy efficiency and renewables, solar PV included, with a loan at a fixed 1% plus a non-repayable grant for micro, small and medium-sized businesses.Worth: Up to 100% of the investment: a loan at 1% plus a grant of up to 35%Closes: 30 December 2026
Show the details

Applications open until 4 p.m. on 30 December 2026, until the funds run out.

Who can claim it

  • Sole traders, partnerships and companies with an operating site in Calabria.
  • Businesses that are economically and financially sound, under the parameters in the Fund's Operating Regulation.
  • With at least two sets of accounts closed.
  • Active in the sectors allowed by the Operating Regulation.
Who is excluded
  • Businesses with fewer than two sets of accounts closed.
  • Sectors excluded by the State aid rules and by the Operating Regulation.

How much it is worth

  • Micro businesses: up to 65% as a subsidised loan and up to 35% as a non-repayable grant (A grant that does not have to be paid back.).
  • Small and medium-sized businesses: up to 70% as a subsidised loan and up to 30% as a grant.
  • Large businesses: up to 90% as a subsidised loan, with no grant.
  • Loan rate: a fixed 1% a year; repayment over 96 months plus a grace period of at most 12 months, in quarterly instalments.
  • Eligible investment: from 80,000 to 3,000,000 euros, excluding VAT.
  • The amount is in any case matched to the business's financial position.
  • Funds available: 45 million euros, of which 15 million for renewable energy systems (Strand B).

Eligible costs

  • Professional costs: design, works supervision, commissioning, energy audit and final energy report.
  • Building works linked to energy efficiency or essential for installing the systems.
  • Brand new machinery and plant, including solar energy systems and storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.).

Requirements for solar PV

  • Solar PV (Strand B) must be carried out together with energy efficiency work on processes or buildings (Strand A), otherwise the application is inadmissible.
  • A system for the business's own generation, even partial, of its energy.
  • The storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) must absorb at least 75% of the energy from the renewable system it is connected to, on an annual basis.

How to apply

  1. 1Register. The legal representative registers on the platform linked to the calabriaeuropa.regione.calabria.it and fincalabra.it websites.
  2. 2Fill in and sign. Fill in the application online, upload the attachments and sign digitally.
  3. 3First come, first served assessment. Fincalabra, the regional company that runs the Fund, examines applications in order of arrival until the funds run out.

Documents

  • Application and descriptive business plan (annex 1).
  • Financial business plan (annex 2).
  • Declaration on the accounting parameters (annexes 3a and 3b).
  • Sworn survey of the production unit (annex 4).
  • DNSH declaration (annex 5).
  • Forms on climate-proofing (annex 6).

Mistakes that cost you the benefit

  • Applying for solar PV alone, without energy efficiency work.
  • Applying with fewer than two sets of accounts or tax returns closed.
  • Waiting for the deadline: applications close earlier if the funds run out.

Example: on an investment of 100,000 euros

For a small business, if all the spending is eligible and the business meets the financial requirements, this is the maximum cover.

On an investment of 100,000 euros
Loan at 1% (up to 70%)70,000 euros to be repaid
Non-repayable grant (up to 30%)30,000 euros
Own funds required0 euros, excluding VAT

Official sources

Checked on 19 November 2026

Emilia-Romagna

Being checkedNon-repayable grant· Emilia-Romagna

Emilia-Romagna - Grants for renewable energy community systems (2025 call)

The call closed on 7 May 2026. The Regione Emilia-Romagna funded, with non-repayable grants, renewable energy systems serving energy communities (CER), applied for by the CER itself or by one of its members.

What is missing: We did not find the grant percentage and ceiling in the text of the call: the regional factsheet does not state them.

Source to check: Regione Emilia-Romagna – PR FESR, scheda del bando CER 2025

OpenSubsidised loan· Emilia-Romagna

Emilia-Romagna - Fondo Energia

Applications are open until 30 November 2026, unless the funds run out first. The Regione Emilia-Romagna's Fondo Energia lends businesses and ESCos up to 100% of the project, 75% of it interest-free, including for renewable energy systems for self-consumption.Worth: Loan of up to 1 million euros, 75% interest-freeCloses: 30 November 2026
Show the details

Applications from 11 a.m. on 12 October to 4 p.m. on 30 November 2026, unless they close earlier because the funds run out. Applications are ranked in order of submission.

Who can claim it

  • Micro, small, medium-sized and large businesses.
  • ESCos (energy service companies).

How much it is worth

  • Loan from 25,000 to 1,000,000 euros, up to 100% of the project.
  • 75% of the loan comes from public funds at zero interest; 25% from the partner bank, at 6-month Euribor plus a spread of at most 4.99%.
  • Term of up to 96 months, with a grace period of up to 18 months.
  • Non-repayable grant (A grant that does not have to be paid back.) for professional costs, up to 12.5% of the public share of the loan.

Eligible costs

  • Renewable energy generating systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.).
  • Energy efficiency in businesses.
  • Seismic upgrading carried out together with energy work.
  • Circularity of processes and the circular economy.

Requirements for solar PV

  • The system must be intended for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.).

Combining it with other incentives

  • According to the Region, recent clarifications from the ministry allow the Fondo Energia to be combined with other national energy transition incentives: check the rules of each measure.

How to apply

  1. 1Pre-loading. From 5 October 2026 you can fill in the application and upload the documents on the Fondo Energia platform.
  2. 2Final submission. From 12 October 2026 you submit the application: submission sets the filing number and the order of priority.

Official sources

Checked on 19 November 2026

ClosedNon-repayable grant· Emilia-Romagna

Emilia-Romagna - Solar PV on car park canopies (renewables in businesses)

The call closed on 16 November 2026. The Regione Emilia-Romagna gave SMEs a non-repayable grant of up to 35% for new solar PV systems on canopies above car parks, with optional storage, for self-consumption.Worth: Up to 35% non-repayable, maximum 100,000 eurosCloses: 16 November 2026
Show the details

Applications from 10 a.m. on 30 September to 1 p.m. on 16 November 2026 (the deadline moved from 15 November, a public holiday). It was not first come, first served.

Who can claim it

  • Individual micro, small and medium-sized businesses, whatever their legal form.
Who is excluded
  • Large businesses.

How much it is worth

  • Grant of up to 35% of the eligible spend.
  • Maximum grant: 100,000 euros.
  • Funds available: 3,000,000 euros from the ERDF Programme 2021-2027, Action 2.2.2.

Eligible costs

  • New solar PV systems on canopies covering existing car parks, or new car parks on already sealed surfaces, optionally with storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.).

Requirements for solar PV

  • The energy produced must go to the applicant business's own consumption.
  • The canopies must cover existing car parks or already sealed surfaces.

How to apply

  1. 1Application on Sfinge 2020. Applications were filed on the Region's Sfinge 2020 system.

Mistakes that cost you the benefit

  • Invoices issued by linked businesses or by businesses with the same owners as the beneficiary: they are not eligible.
  • Invoices without the Unique Project Code (CUP).

Official sources

Checked on 19 November 2026

Friuli Venezia Giulia

Being checkedNon-repayable grant· Friuli Venezia Giulia

Friuli Venezia Giulia - Grants for renewable energy community systems (2026)

The 2026 window closed on 15 April 2026; the ranking was published on 10 November 2026. The Regione Friuli Venezia Giulia gives non-repayable grants to energy communities and their members, individuals excluded, to build or upgrade renewable energy systems.

What is missing: We did not find the grant percentage and ceiling in the regional regulation: the Region's page does not state them.

Source to check: Regione Autonoma Friuli Venezia Giulia – Energia, contributi CER

ClosedNon-repayable grant· Friuli Venezia Giulia

Friuli Venezia Giulia - Solar PV on farm buildings of agricultural SMEs (2026 call)

The 2026 call closed on 31 May 2026. The Regione Friuli Venezia Giulia gave agricultural SMEs 40% in non-repayable grants for new solar PV systems of 20 to 130 kWp on farm buildings, and 100% to replace asbestos or fibre-cement roofs.Worth: 40% for the solar PV, 100% to replace asbestos roofsCloses: 31 May 2026
Show the details

Applications from 11 March to 31 May 2026, on a first come, first served basis. Under resolution no. 1480 of 9 October 2026 the extension for reporting runs to 15 months.

Who can claim it

  • SMEs active in the production of agricultural products, listed in the Business Register, with an operating unit in the region.
  • Holding an electronic farm file and at least one validation sheet.
  • Owning or having the use of the whole farm building the system goes on.
Who is excluded
  • Anyone who has already received a grant for the same system under the 2023 or 2025 calls.

How much it is worth

  • 40% of the eligible costs for buying and installing the solar PV system.
  • 100% of the eligible costs for replacing and disposing of asbestos or fibre-cement roofs.
  • Aid under the general «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» regime (EU regulation 2023/2831).
  • Eligible costs are capped by capacity and by square metre as set out in the call.

Eligible costs

  • Buying and installing the solar PV system, including connection charges, safety costs and the electrical substation.
  • Replacing and disposing of asbestos or fibre-cement roofs, including over-roofing the fibre cement.
  • Professional and insurance costs.
  • Costs incurred from 1 January 2026.

Requirements for solar PV

  • A new system with a capacity between 20 and 130 kWp, on the roof of farm buildings or structures in the region.
  • A 3-year restriction on the system's use.

Combining it with other incentives

  • The grant for the solar PV system cannot be combined with other public incentives on the same costs.
  • The costs for the asbestos or fibre-cement roofs can be combined up to the spend incurred.

How to apply

  1. 1Application by certified email. One application per business, on the regional form, sent by certified email (PEC) to the Servizio competitività del sistema agroalimentare with the documents required.

Mistakes that cost you the benefit

  • Asking for an extension of the reporting deadline after it has passed: it must be requested, with reasons, before the deadline.

Official sources

Checked on 19 November 2026

ClosedNon-repayable grant· Friuli Venezia Giulia

Friuli Venezia Giulia - Grants for solar PV in manufacturing, services and construction businesses

The 2026 window closed on 30 September 2026. The Regione Friuli Venezia Giulia gives non-repayable grants of 30% to 50% for new solar PV systems for self-consumption at the business's premises, with optional storage, up to 500,000 euros per business.Worth: From 30% to 50% non-repayable, maximum 500,000 euros per businessCloses: 30 September 2026
Show the details

2026 deadlines: from 20 July to 30 September 2026. The measure is governed by a regional regulation and the window has been opened year by year.

Who can claim it

  • Micro, small, medium-sized and large businesses whose primary activity is in manufacturing, services or construction, at the premises where the system is installed.
  • Also consortia, consortium companies and business networks with legal personality.
  • Also businesses with no premises in the region at the time of the application, if they open them before payment.

How much it is worth

  • Systems up to 1,000 kWp: 50% for micro and small businesses, 40% for medium-sized ones, 30% for large ones.
  • For the share of capacity above 1,000 and up to 3,000 kWp: 20% for all businesses.
  • For the share above 3,000 and up to 5,000 kWp: 10% for all businesses.
  • Minimum eligible spend: 20,000 euros. Maximum grant: 500,000 euros per business.
  • Professional and connection costs are eligible up to a percentage of the other costs that falls as capacity rises: 20% up to 50 kWp, 15% up to 100 kWp, 10% above that.

Eligible costs

  • Supply and installation of new solar PV systems, including works, inverters, switchboards, wiring, structures and substations.
  • New storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.), with a capacity no greater than twice the system's capacity.
  • Smart energy monitoring and management systems.
  • Design, technical reports, works supervision, commissioning and connection charges.

Requirements for solar PV

  • A new system or an upgrade, with a capacity of up to 5,000 kWp, at the premises or local unit in the region.
  • Expected output no greater than annual needs, with a 15% tolerance, certified by a qualified professional.
  • Ground-mounted systems are eligible only as an upgrade, within the business's own grounds and once the roofs are already full.
  • A minimum score of 12 points out of 32 under Annex A to the regulation.

How to apply

  1. 1Application on IOL. One application per business, for a single project at a single site, on the Region's Istanze On Line (IOL) system.
  2. 2Award. First come, first served in order of submission, among the applications with at least 12 points, within 120 days and until the funds run out.
  3. 3Works and reporting. The project must be completed and reported within 15 months of the award decree, extendable by 6 months.

Documents

  • Documentation drawn up on the templates published on the regional forms page.

Mistakes that cost you the benefit

  • Starting the project (an order, a contract or a signed quotation) before filing the application.
  • Ceasing the business or moving it out of the region within 3 years (SMEs) or 5 years (large businesses) of the end of the project.

Official sources

Checked on 19 November 2026

Lazio

ClosedNon-repayable grant· Lazio

Lazio - Energia Solare per le Imprese

The call is closed. The Regione Lazio gave businesses non-repayable grants for new solar PV systems and storage for self-consumption: applications could be filed until 31 March 2026 and the funds have run out.Worth: Up to 65% for the solar PV, maximum 1 million euros per businessCloses: 31 March 2026
Show the details

Applications closed on 31 March 2026; under the decision of 5 November 2026 the funds have run out.

Who can claim it

  • Businesses already listed in the Business Register, operating at the site where the system is installed.
  • Large businesses only if they install at least 600 kWp of new solar PV capacity.
  • Also the business that owns the property where other businesses work, under a registered contract.
Who is excluded
  • Systems serving residential property units.
  • Systems in protected natural areas or in Natura 2000 network sites.

How much it is worth

  • Solar PV system: 65% for micro and small businesses, 55% for medium-sized ones, 45% for large ones.
  • Storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) and ancillary costs: 50% for micro and small businesses, 40% for medium-sized ones, 30% for large ones.
  • Maximum grant: 1,000,000 euros per business.
  • Minimum project: 75,000 euros.
  • Funds available: 20 million euros from the ERDF Lazio Programme 2021-2027.

Eligible costs

  • Supply and installation of the solar PV system, within the cost limits of ministerial decree 414 of 2023.
  • Supply and installation of the storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.).
  • Design and professional costs up to 15% of the costs for the system and the storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.).
  • Interim accounts drawn up by an accountant, in the cases provided for.
  • The premium on the guarantee for the advance.

Requirements for solar PV

  • A system connected to the grid and registered in the GAUDÌ system (Terna's register of generating plants).
  • Modules listed in the Register of Photovoltaic Technologies kept by ENEA.
  • Installation on the roofs of the operating site or of its appurtenances.
  • Output no greater than the site's annual electricity needs, with a 20% tolerance.
  • Behind-the-meter storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.), charged at least 75% by the solar PV system.
  • Requirements certified by a qualified professional with no conflict of interest.

Combining it with other incentives

  • The grant may be conditional on waiving other incompatible grants. The call we read does not list which.

How to apply

  1. 1Online form. The form was available on Lazio Innova's GeCoWEB Plus from 19 January 2026.
  2. 2Filing the application. Applications on GeCoWEB Plus from 3 February to 31 March 2026, on a first come, first served basis.
  3. 3Assessment. A panel checked the requirements and the score: at least 40 points out of 100 were needed.
  4. 4Works and payment. The project had to be completed, paid for and reported within 12 months of the award. A compulsory 40% advance against a guarantee, to be requested within 60 days.

Documents

  • A qualified professional's certificate on the system's requirements.
  • A guarantee for the advance.
  • On the balancing payment: the installer's declaration of conformity (ministerial decree 37 of 2008) and proof of grid connection and GAUDÌ registration.

Mistakes that cost you the benefit

  • Sizing the system above the site's annual electricity needs plus 20%.
  • Failing to request the advance within 60 days of the award.
  • Installing on the ground instead of on the roofs of the site.

Official sources

Checked on 19 November 2026

Liguria

ClosedNon-repayable grant· Liguria

Liguria - Energy efficiency and renewables in public buildings (fourth call)

The call closed on 30 September 2026. Through two windows in 2026 the Regione Liguria funded, with non-repayable grants of up to 70% (80% for small municipalities), the energy upgrading of public buildings, with solar PV eligible up to 20% of the spend.Worth: Up to 70% non-repayable (80% for small municipalities), maximum 1 million eurosCloses: 30 September 2026
Show the details

First window from 10 to 26 February 2026; second from 17 to 30 September 2026.

Who can claim it

  • Provinces and the Metropolitan City of Genova.
  • Municipalities in Liguria of up to 40,000 residents, inner areas included.
  • Regional agencies and companies, port system authorities, park authorities, chambers of commerce.
  • Also those who have already received grants under actions 2.1.1 and 5.2.1, but for different buildings.

How much it is worth

  • Up to 70% for projects of at least 300,000 euros.
  • Up to 80% for municipalities in inner areas or with fewer than 2,000 residents, for projects of at least 100,000 euros.
  • Maximum grant: 1,000,000 euros per application.

Eligible costs

  • Renewable energy systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) only, up to 20% of the spend, together with energy efficiency work on the building.

Requirements for solar PV

  • An improvement of at least one energy class and a saving of at least 30% of primary energy.

Mistakes that cost you the benefit

  • Selling the asset or changing the project within 5 years: the durability of the work must be guaranteed.

Official sources

Checked on 19 November 2026

ClosedNon-repayable grant· Liguria

Liguria - Energy efficiency and renewables in public buildings (fifth call)

The call is open until 24 November 2026. The Regione Liguria funds, with non-repayable grants of up to 70% (80% for small municipalities and inner areas), the energy upgrading of public buildings: solar PV is eligible as part of the project, up to 20% of the spend.Worth: Up to 70% non-repayable (80% for small municipalities), maximum 1 million eurosCloses: 24 November 2026
Show the details

Applications from 8:30 a.m. on 10 November to 5:30 p.m. on 24 November 2026; offline drafting from 4 November.

Who can claim it

  • Provinces and the Metropolitan City of Genova.
  • Municipalities in Liguria of up to 40,000 residents, inner areas included.
  • Regional agencies and companies, port system authorities, park authorities, chambers of commerce.
  • Also those who have already received grants under actions 2.1.1 and 5.2.1, but for different buildings.

How much it is worth

  • Up to 70% of the spend.
  • Up to 80% for municipalities in the inner areas of Liguria or with fewer than 2,000 residents.
  • Maximum grant: 1,000,000 euros per application.
  • Funds available: 7,000,000 euros from the ERDF Liguria Programme 2021-2027, Action 2.1.1.

Eligible costs

  • Insulation, windows, shading, heating systems, lighting, building automation.
  • Solar thermal systems or other renewable systems, such as solar PV, for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) only and up to 20% of the eligible amounts for works, systems and supplies.
  • Work on the roof pitches to lay the solar panels and improve their orientation.

Requirements for solar PV

  • The solar PV must serve the building's own consumption.
  • The project must raise the building by at least one energy class and save at least 30% of primary energy.

How to apply

  1. 1One application per body. Each body files a single application, which may cover several measures.
  2. 2Filse's Bandi online. The application is submitted on the «Bandi online» system of Filse, the regional finance company.
  3. 3Eligible costs. Work carried out from 29 May 2026 can be reported, provided the investment closes after the application.

Official sources

Checked on 19 November 2026

Lombardia

OpenNon-repayable grant· Lombardia

Lombardia - Investimenti, Impresa efficiente strand

Applications are open. The Regione Lombardia gives SMEs a non-repayable grant plus a free guarantee on the loan for energy efficiency projects on production processes. Solar PV is eligible only together with that work, not on its own.Worth: Non-repayable grant of up to 45% for renewables, plus a free guarantee on the loanCloses: A new application window opened at 4 p.m. on 20 July 2026, first come, first served in order of submission; the factsheet gives no closing date. First opening: 16 September 2025.
Show the details

Who can claim it

  • Small and medium-sized businesses with at least two sets of accounts filed (or two tax returns).
  • An operating site in Lombardia, which may be opened by the time the grant is awarded, where the project is carried out.
  • A credit rating class from 1 to 10 under the Fondo Centrale di Garanzia model.
Who is excluded
  • Large businesses.

How much it is worth

  • Investments in renewable energy (European regulation, article 41): up to 45% non-repayable (A grant that does not have to be paid back.).
  • Energy efficiency of processes (article 38): up to 20% for micro and small businesses, 15% for medium-sized ones.
  • Alternatively, under the «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» regime (small-scale aid): 25% up to 250,000 euros.
  • The rest, up to 100% of the investment, is covered by a bank loan with a free regional guarantee of 70%, a term of 3 to 6 years, at market rates.
  • Investment from 100,000 to 5,000,000 euros.

Eligible costs

  • Upgrading or renewing existing production plant to cut consumption and emissions.
  • Renewable energy systems, such as solar PV, combined with that work.

Requirements for solar PV

  • Solar PV counts only together with efficiency work on the production plant.
  • In calculating the cut of at least 30% in emissions, solar PV counts only for the self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) share.

Combining it with other incentives

  • From July 2026 it can be combined with other aid on the same costs up to 100% of the eligible costs and within the European intensity limits.
  • It cannot be combined with recovery plan (PNRR) aid.

How to apply

  1. 1Loan approval. Obtain from a partner lender the certificate of the loan approval.
  2. 2Application on Bandi e Servizi. File the application online only, on the Regione Lombardia's Bandi e Servizi platform.
  3. 3Assessment. Finlombarda, which runs the measure, examines applications in order of arrival and the Region decides within 120 days. The grant is paid in a single balancing payment.

Documents

  • Certificate of the loan approval.
  • Project timetable on the regional form.
  • Energy audit under the UNI EN 16247 standard, signed by a qualified professional.
  • Form on the size of the business and customer due diligence form; anti-mafia forms where required.

Mistakes that cost you the benefit

  • Applying for the grant for a solar PV system on its own, without work on the production plant.
  • Counting the energy fed into the grid among the emissions avoided, instead of the self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) share alone.

Official sources

Checked on 19 November 2026

Marche

Being checkedNon-repayable grant· Marche

Marche - Charging points with solar PV for public bodies (ERDF 2021-2027)

Call open to public bodies and their companies: it funds charging points for public service vehicles, powered mainly by a renewable system such as solar PV on canopies. Applications on SIGEF until 26 February 2027.

What is missing: We have not yet found the grant percentage and ceiling in the call. Dates and eligible applicants are verified on the Region's page.

Source to check: Regione Marche – scheda bando 28650

OpenNon-repayable grant· Marche

Marche - Renewable Energy Communities call (ERDF 2021-2027)

The call is open until 29 January 2027 or until the funds run out. The Regione Marche gives renewable energy communities (CER) a non-repayable grant of 40% for new systems, solar PV included.Worth: 40% of the investment, up to 300,000 eurosCloses: 29 January 2027
Show the details

First come, first served, until 29 January 2027 or until the funds run out.

Who can claim it

  • CERs already set up at the time of the application, with an operating site in Marche.
  • The CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s members must also be resident or have an operating site in Marche.
  • The CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) must be listed in the Business Register, the REA or the Third Sector Register, depending on its legal form.
Who is excluded
  • Individual businesses, bodies or apartment buildings not applying as a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.): the grant goes to the energy community.

How much it is worth

  • A capital grant of 40% of the eligible investment.
  • Maximum grant: 300,000 euros, the ceiling of the «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» regime (small-scale aid) over the last three years.
  • Minimum investment: above 200,000 euros, excluding VAT.
  • Funds available: 3,800,000 euros.

Eligible costs

  • Supply, installation and fitting of the system, including inverters, storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.), canopies and electrical components.
  • Necessary building and plant works, including upgrading the roof (removing asbestos and insulating).
  • Smart grid up to 30% of the eligible investment.
  • Monitoring, remote control and remote management systems.
  • Professional costs up to 10% and the costs of setting up the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) up to 10% of the cost of works and supplies.

Requirements for solar PV

  • A new system (or an upgrade) forming part of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) configuration.
  • Newly built solar PV components.
  • A capacity no greater than 1 MW per system.
  • The system is in the area of the configuration's own primary substation, owned by and under the control of the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
  • Self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) of at least 60% of the renewable energy produced, calculated with ENEA's RECON simulator.

Combining it with other incentives

  • It cannot be combined, for the same costs, with other public support, except the premium tariff for CERs under ministerial decree 414 of 2023.
  • According to the Region, the premium tariff can be combined with capital grants of up to 40%, but it is reduced.

How to apply

  1. 1Simulate the CER. Work out the indicators with ENEA's RECON simulator (registration is free).
  2. 2Log in to SIGEF. The CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s legal representative (or an authorised agent) registers on the Regione Marche's SIGEF portal.
  3. 3File the application. Online application on SIGEF from 30 September 2026 to 29 January 2027. Applications are examined in order of arrival.
  4. 4Carry out the project. The work must start within 2 months of the award and finish within 15 months (8 and 20 months if a public administration is part of the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)).

Documents

  • Technical report on the project (annex 4).
  • DNSH declaration (Do No Significant Harm to the environment).
  • Declaration on «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» aid.
  • Declaration on combining aid.
  • Declaration by the owner of the building or land.

Mistakes that cost you the benefit

  • Applying as an individual business instead of as a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
  • Staying below 60% self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) as calculated with RECON.
  • Making out the invoices to someone other than the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
  • Having already used up the «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» ceiling: the grant is reduced automatically.

Example: on an investment of 500,000 euros

If all the spending is eligible and the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) has had no other «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» aid over the last three years, the grant is 40%.

On an investment of 500,000 euros
Eligible investment500,000 euros
Regional grant (40%)200,000 euros
Left to the CER300,000 euros

Official sources

Checked on 19 November 2026

Piemonte

ClosedSubsidised loan· Piemonte

Piemonte - Renewable energy in businesses 2026

The call is open until 27 November 2026, first come, first served. The Regione Piemonte funds up to 100% of the eligible costs of businesses' renewable energy systems, solar PV included, with a subsidised loan plus a non-repayable share of 10% to 30% depending on the size of the business.Worth: Up to 100% of the costs: subsidised loan plus a non-repayable share of 10% to 30%Closes: 27 November 2026
Show the details

Applications until 12 noon on 27 November 2026, unless the window closes earlier because the funds run out.

Who can claim it

  • Micro, small and medium-sized businesses.
  • Large businesses.
  • Each business may file a single application.
Who is excluded
  • Ground-mounted solar PV systems on land zoned for agricultural use at the date of the application.

How much it is worth

  • Micro and small businesses: at least 70% as a loan and up to 30% non-repayable (A grant that does not have to be paid back.).
  • Medium-sized businesses: at least 80% as a loan and up to 20% non-repayable (A grant that does not have to be paid back.).
  • Large businesses: at least 90% as a loan and up to 10% non-repayable (A grant that does not have to be paid back.).
  • 70% of the loan is interest-free from public funds and the rest (at least 30%) comes from the bank's own funds.
  • The total aid cannot exceed the ceiling in the European regulation: for a new solar PV system 65% for micro and small businesses, 55% for medium-sized ones, 45% for large ones; for storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) 50%, 40% and 30%. If it is exceeded, the non-repayable (A grant that does not have to be paid back.) share is reduced.
  • Funds available: 12,200,000 euros from the ERDF Piemonte Programme 2021-2027.

Eligible costs

  • New renewable electricity generating systems, solar PV included, on the roof of existing buildings or ground-mounted on non-agricultural land.
  • Renewable heating systems, including heat pumps complying with the European directive.
  • Storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.) connected directly to a renewable energy system.

Requirements for solar PV

  • The system must serve only to cover the business's average annual consumption, and this must be shown in the technical and economic report.
  • The storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) must absorb at least 75% of the energy produced each year by the system it is connected to.
  • The work must be carried out within 18 months of the aid being awarded.

Combining it with other incentives

  • It can be combined with other aid on the same costs only within the maximum intensity set by the applicable European regulation.

How to apply

  1. 1Bank approval. Before the application you need a letter from a bank partnered with Finpiemonte certifying that it has approved the loan.
  2. 2Online application. You fill in the online form on the Regione Piemonte services portal (PR ERDF calls), sign it digitally and upload the attachments.
  3. 3First come, first served assessment. Applications are examined in order of arrival; assessment starts only for those covered by the funds available.

Documents

  • An energy audit signed by a qualified professional, under the UNI CEI EN 16247 standard, based on two years of consumption: without it the application is inadmissible.
  • A technical and economic report following Annex 5 to the call, digitally signed by a qualified professional.
  • The approval letter from the partner bank.
  • Drawings, photographs, quotations covering at least 70% of the investment, a «climate proofing» declaration.
  • For electrical systems: the grid connection request.
  • A 16-euro revenue stamp.

Mistakes that cost you the benefit

  • Filing the application without the energy audit, the technical and economic report or the bank approval: it is inadmissible.
  • Sizing the system above the business's average annual consumption.

Official sources

Checked on 19 November 2026

Puglia

Being checkedNon-repayable grant· Puglia

Puglia - New call for energy community systems (announced)

The Regione Puglia has announced a new call to build and upgrade renewable systems serving energy communities across the region. We are checking the details against the official source.

What is missing: We were unable to read the Regione Puglia's official announcement: amounts, eligible applicants, percentages and opening date are unverified.

Source to check: Regione Puglia – comunicato stampa (da leggere)

OpenNon-repayable grant· Puglia

Puglia - Energy communities in the province of Taranto (JTF 2021-2027)

The call is open until 30 November 2026, for the province of Taranto only. The Regione Puglia gives a non-repayable grant of 40% to public bodies, publicly owned companies and SMEs building renewable energy systems serving an energy community (CER).Worth: 40% of the spend, up to 500,000 euros per proposalCloses: 30 November 2026
Show the details

First come, first served, until 12 noon on 30 November 2026.

Who can claim it

  • Public bodies in the province of Taranto included among the local administrations in the ISTAT list.
  • Companies with a direct majority public shareholding and an operating site in the province of Taranto.
  • SMEs with an operating site in the province of Taranto.
  • The applicant must be a member of the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.), already set up or to be set up before the work starts, with its registered office in the province of Taranto.
Who is excluded
  • Large businesses.
  • Parties with their operating site outside the province of Taranto.

How much it is worth

  • A grant equal to 40% of the eligible spend actually incurred.
  • Maximum grant: 500,000 euros per proposal; 800,000 euros in all for the same CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) where there are several proposals.
  • Minimum cost of the proposal: 100,000 euros.
  • Funds available: 7,910,000 euros from the National Just Transition Fund Programme, Taranto territorial plan.
  • Aid granted under article 41 of Regulation (EU) 651/2014.

Eligible costs

  • Building or upgrading renewable energy systems (solar or wind) serving the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).

Requirements for solar PV

  • A system in the province of Taranto, made available to a single configuration of the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
  • Ownership or full use of the land or building, including under a loan-for-use or lease of at least 10 years (an easement is not enough).

How to apply

  1. 1One proposal only. Each applicant may file a single proposal, which may cover several systems.
  2. 2Online application. It is filed only on the Regione Puglia's platform (Catalogo bandi, «Vai alla domanda» button), until 12 noon on 30 November 2026.
  3. 3Assessment and outcome. The Region approves by management decision the list of proposals admitted, funded and excluded.

Documents

  • Funding application (annex A1).
  • Project sheet (A2).
  • Climate check (A3) and DNSH check (A4).
  • Certificate of the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s PODs (A5).
  • Declaration on the size of the business and its financial capacity (A7).

Mistakes that cost you the benefit

  • Proposing a system made available to more than one configuration.
  • Holding only an easement over the land.
  • Filing a proposal below 100,000 euros.

Example: on an investment of 500,000 euros

If all the spending is eligible and incurred, the grant is 40%, under the ceiling of 500,000 euros per proposal.

On an investment of 500,000 euros
Eligible spend incurred500,000 euros
Regional grant (40%)200,000 euros
Left to the applicant300,000 euros

Official sources

Checked on 19 November 2026

Sardegna

ClosedNon-repayable grant· Sardegna

Sardegna - First come, first served call on Energy Efficiency and Renewable Energy 2025

The call closed on 31 July 2026; the funds for renewables had already run out. The Regione Sardegna gave non-repayable grants to SMEs for energy efficiency and renewable systems, mainly solar PV, with storage.Worth: Up to 65% for renewables, from 20,000 to 500,000 eurosCloses: 31 July 2026
Show the details

The deadline was extended to 31 July 2026 by decision no. 702/26674 of 29 June 2026; the Region announced that the funds for Action 3.2.1 had run out.

Who can claim it

  • Micro, small and medium-sized businesses in manufacturing, accommodation, sports facility management, retail, vehicle repair and washing, mining and quarrying.
Who is excluded
  • Large businesses.
  • Sectors not listed in the call.

How much it is worth

  • Renewable systems: 65% for micro and small businesses, 55% for medium-sized ones.
  • Storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.): 50% for micro and small businesses, 40% for medium-sized ones.
  • Grant from 20,000 to 500,000 euros under the GBER exemption; under «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» up to the ceiling available.
  • Funds available: 29 million euros, of which 6,527,037.14 euros for renewables (Action 3.2.1).

Eligible costs

  • Renewable energy systems, mainly solar PV.
  • Storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.).
  • Energy efficiency work on production processes (Action 3.1.1).

How to apply

  1. 1SIPES platform. Applications were filed on a first come, first served basis on the Regione Sardegna's SIPES platform.

Official sources

Checked on 19 November 2026

Sicilia

ClosedNon-repayable grant· Sicilia

Sicilia - «Sicilia efficiente: meno consumi, più futuro» call

The call closed on 12 February 2026. The Regione Siciliana gave non-repayable grants to micro, small and medium-sized businesses for energy efficiency, including solar PV for self-consumption only, with the aim of cutting consumption and emissions by at least 30%.Worth: 60% for micro and small businesses, 50% for medium-sized onesCloses: 12 February 2026
Show the details

Applications from 12 January to 12 February 2026 (dates moved by decree no. 3360 of 27 November 2025).

Who can claim it

  • Private-sector micro, small and medium-sized businesses, alone or in association.
  • With a production unit in Sicilia at the time of the first payment claim or of the advance.
Who is excluded
  • Large businesses.

How much it is worth

  • Non-repayable grant (A grant that does not have to be paid back.) of 60% for micro and small businesses and 50% for medium-sized ones.
  • Investment programme between 50,000 and 500,000 euros.
  • Advance of up to 40% of the grant, against a guarantee.
  • Funds available: 89,119,066 euros from the ERDF Sicilia Programme 2021-2027, Action 2.1.2.

Eligible costs

  • Work on buildings, plant, machinery and equipment of existing production units.
  • Renewable energy generating systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) only.
  • Systems monitoring consumption and emissions, alongside the main works.

Requirements for solar PV

  • Solar PV is eligible only for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) and within an energy efficiency programme.
  • The programme as a whole must cut consumption and emissions by at least 30% against the starting position.
  • An energy audit is required.
  • New technologies only.

Combining it with other incentives

  • It cannot be combined, on the same costs, with other State aid or «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» aid, except support in the form of tax relief and guarantees, within the maximum intensities set by the State aid rules.

How to apply

  1. 1Platform. Applications on the ap2127.regione.sicilia.it platform, with the legal representative's level 2 SPID, CNS or CIE, a digital signature and a certified email address (PEC).
  2. 2First come, first served. Applications were assessed in order of arrival until the funds ran out.

Documents

  • Energy audit.
  • Annex G and the call's forms.
  • A guarantee for the advance, where requested.

Mistakes that cost you the benefit

  • Proposing a solar PV system not intended solely for the production unit's own consumption.
  • Failing to reach the 30% cut in consumption and emissions.

Official sources

Checked on 19 November 2026

Umbria

Being checkedSubsidised loan· Umbria

Umbria - Renewable Sources call 2026 (reported)

The Regione Umbria has a 2026 ERDF Programme call for renewable energy in businesses, run as a financial instrument. We are checking it against the official source.

What is missing: The websites of the Regione Umbria and of the regional finance company Gepafin did not load: we could not read the call, so eligible applicants, amounts, interest rate and deadlines are unverified.

Source to check: Regione Umbria – notizia sui bandi energia (da controllare)

Valle d’Aosta

ClosedNon-repayable grant· Valle d'Aosta

Valle d'Aosta - Systems for energy communities, measure for legal entities

The call closed on 13 November 2026. The Regione Valle d'Aosta gave up to 40% in non-repayable grants to renewable energy communities (CER) and to the businesses or bodies that belong to them, for new solar PV, wind, hydroelectric, biomass or biogas systems.Worth: Up to 40% of the spendCloses: 13 November 2026
Show the details

Applications from 5 May 2025 until the funds run out and no later than 12 noon on 13 November 2026.

Who can claim it

  • Renewable energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
  • Legal entities (businesses, bodies) that are members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).

How much it is worth

  • Up to 40% of the eligible spend, within the maximum costs in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Operating Rules.
  • One application per system.

Eligible costs

  • Systems generating electricity from solar PV, wind, hydroelectric, biomass and biogas sources.

How to apply

  1. 1Application on SISPREG. Applications were filed on the regional SISPREG platform.

Official sources

Checked on 19 November 2026

OpenNon-repayable grant· Valle d'Aosta

Valle d'Aosta - Energy efficiency in businesses (ERDF)

The call is open until 31 December 2026, unless the funds run out first. The Regione Valle d'Aosta gives 30% to 50% in non-repayable grants (60% under «de minimis») to industrial and craft businesses for energy efficiency projects; solar PV and storage can be added, but not on their own.Worth: From 30% to 50% non-repayable (60% under de minimis)Closes: 31 December 2026
Show the details

The deadline was extended to 31 December 2026 (decision no. 811 of 23 September 2026), unless the funds run out first.

Who can claim it

  • Industrial and craft businesses whose main activity falls under the ATECO codes in Annex 1 of the call, on an existing production site in Valle d'Aosta.

How much it is worth

  • Under the European block exemption regulation: 50% small, 40% medium-sized, 30% large business.
  • Plus 5 percentage points for certain work on buildings in municipalities in assisted areas; plus 15 points if the building improves by at least 40% in primary energy.
  • Alternatively, the «de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.)» regime: up to 60%.
  • Eligible spend from 150,000 to 2,000,000 euros, excluding VAT.

Eligible costs

  • At least two efficiency measures on a building (envelope, windows, systems, lighting, automation) or measures on the production process.
  • In addition: renewable electricity generating systems, renewable heating systems, storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.) and the panels' mounting structures.
  • Professional costs up to 10% of the eligible spend.

Requirements for solar PV

  • Solar PV is eligible only as a complement to at least two energy efficiency measures.

How to apply

  1. 1Registration on SISPREG. Register and accredit the business on the regional SISPREG platform.
  2. 2Application. Fill in the form on SISPREG with the attachments and the stamp duty paid electronically. The scheme is run by Finaosta.

Documents

  • STEP form and supporting spreadsheet.
  • Financial plan and funding arrangements.
  • Anti-mafia, beneficial owner and traceability of financial flows declarations.

Official sources

Checked on 19 November 2026

OpenNon-repayable grant· Valle d'Aosta

Valle d'Aosta - Grants for solar PV for individuals and apartment buildings

The call is open from 16 November 2026, until the funds run out and no later than 30 September 2027. The Regione Valle d'Aosta gives 40% in non-repayable grants for solar PV systems and storage, including in apartment buildings: up to 12,000 euros for the system and 4,800 euros for the storage.Worth: 40% non-repayable, up to 16,800 euros per applicationCloses: 30 September 2027
Show the details

Applications from 10 a.m. on 16 November 2026 until the funds run out, and in any case no later than 12 noon on 30 September 2027.

Who can claim it

  • Apartment buildings, through the manager authorised by the owners' meeting, for systems serving the common parts.
  • Buildings with several owners and no manager: the person appointed by the other owners.
  • Individuals who have the use of the home served by the system.
Who is excluded
  • Businesses and public bodies: this call is for individuals and apartment buildings.

How much it is worth

  • Grant of up to 40% of the eligible spend.
  • Solar PV system: maximum eligible spend 30,000 euros, maximum grant 12,000 euros.
  • Storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.): maximum eligible spend 12,000 euros, maximum grant 4,800 euros.
  • Maximum grant per application: 16,800 euros, with both the system and the storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) at or above 20 kW and 20 kWh.

Eligible costs

  • Solar PV system.
  • Storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.).

How to apply

  1. 1Resolution of the owners' meeting. In an apartment building the manager must be authorised by the owners' meeting for the system on the common parts.
  2. 2Online application. The application is filed on the regional portal «Aree idonee - Contributi fotovoltaico».

Official sources

Checked on 19 November 2026

Veneto

ClosedNon-repayable grant· Veneto

Veneto - Renewable energy systems in energy communities (CER 2 call)

The call closed on 5 February 2026. The Regione del Veneto gave 40% in non-repayable grants, up to 300,000 euros, for renewable energy systems, solar PV included, forming part of a renewable energy community (CER).Worth: 40% non-repayable, up to 300,000 eurosCloses: 5 February 2026
Show the details

The deadline was extended to 5 p.m. on 5 February 2026.

Who can claim it

  • Renewable energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) set up under the national rules.
  • Municipalities and public administrations.

How much it is worth

  • Grant equal to 40% of the eligible spend.
  • Maximum grant: 300,000 euros.
  • Minimum eligible spend: 15,000 euros.
  • Funds available: 6,000,000 euros from the ERDF Veneto Programme 2021-2027, Action 2.2.1.

Eligible costs

  • Renewable electricity generating systems forming part of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.), built in municipalities in Veneto.
  • For solar PV systems the spend is calculated with simplified standard costs, as provided for by the European regulation.

How to apply

  1. 1Application on Fondi.RVE. Applications were filed online only, on the Region's Programming Information System (Fondi.RVE).

Official sources

Checked on 19 November 2026

Being checkedNon-repayable grant· Veneto

Veneto - Solar PV and storage for SMEs in the Distretti del Commercio (reported)

Some operators report a 2026 call from the Regione del Veneto for solar PV and storage for small and medium-sized businesses in the Distretti del Commercio (retail districts). We are checking it against regional sources.

What is missing: Only installers' websites report it: we did not find the call on the Regione del Veneto website, so dates, amounts and eligible applicants are unverified.

Source to check: Regione del Veneto – elenco bandi (da controllare)

Which sectors it applies to

  • Manufacturing

    Most regional calls are for businesses. Watch the combination rules: many forbid adding other State aid on the same costs.

  • Retail and hospitality

    Shops and hotels fall under the calls for businesses, when the call does not exclude their business activity code: check the eligible sectors.

  • Logistics and warehouses

    The calls for businesses in the Region where the warehouse stands apply.

  • Public bodies

    Some Regions have calls dedicated to local authorities or to energy communities promoted by municipalities.

  • Apartment buildings

    Regional calls for apartment buildings are rare; regional energy communities can involve apartment buildings too.

  • Agriculture

    For farms, regional calls often come from the rural development programmes: check your Region's calls page.

Frequently asked questions

How do I find out whether there is a call in my region?

Look for your region on this page: for each one you will find the outcome of our check, the date and the link to the official page where the Region publishes its calls. If nothing is open we say so, with the date.

Can I add a regional grant to enhanced depreciation?

It depends on the call. Enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) allows combining if the two forms of aid do not cover the same share of the cost and do not exceed the spend, and it is calculated net of the grant. Many regional calls, though, forbid any combination with other aid on the same costs: read the «Combining it with other incentives» section of the entry.

What does «closed» mean on this page?

That applications cannot be filed today: the deadline has passed or the funds have run out. We keep the calls closed over the last twelve months because Regions often reopen them with similar rules.

How often do you update this page?

We check the calls and the Regions' official pages every week. The date of the check is written beside each region.

Updates

  1. First full check of every Region and Autonomous Province.

Related pages

Find out which grants apply in your region

Sofia sizes the system around your consumption, applies the incentives you are entitled to and puts you in touch with 2-3 installers. Free of charge.

The information on this page is guidance, current at the date shown and based on the official sources cited. It does not replace the opinion of an accountant or an adviser: before committing to an investment, check your own case with a professional.