Solar PV grants and incentives for industry
For an industrial business the main incentive today is enhanced depreciation: the cost of a system for self-consumption is deducted with a 180% uplift up to 2.5 million euros, for systems completed by 30 September 2028. In the South and in the simplified logistics zones you can also consider a tax credit, and the surplus energy is sold to the GSE.
Updated on official sources checked
6
incentives open today
31 December 2027
next deadline: GSE premium tariff for shared energy
180%
enhanced depreciation up to 2.5 million euros
9 of 9
entries checked against official sources
All the incentives at a glance
Each row takes you to its section. Greyed-out entries are being checked: we show what is missing and no figures.
9 incentives shown
| Incentive | Who can claim it | How much | Closes | Status |
|---|---|---|---|---|
| Enhanced depreciation 2026-2028 (Nuovo Piano Transizione 5.0) | Businesses with business income | 180% of the cost up to 2.5 million euros | 30 September 2028 | Open |
| ZES unica tax credit for southern Italy 2026-2028 | Businesses with a production facility in the assisted areas of the ZES unica | Up to 70%, then cut in proportion to demand | 31 December 2028 | Open |
| ZLS tax credit - Simplified logistics zones 2026-2028 | Businesses with a production facility in a ZLS, in the «c» areas only | The maximum intensity in the Regional Aid Map, reduced in proportion to demand | 31 December 2028 | Open |
| Nuova Sabatini (MIMIT capital assets scheme) | Micro, small and medium-sized businesses (SMEs) in every sector, agriculture included | A loan from 20,000 euros to 4 million over 5 years + a grant equal to interest at 2.75% (ordinary) or 3.575% (green and 4.0) | no closing date | Open |
| GSE premium tariff for shared energy (energy communities and distributed self-consumption) | Distributed self-consumption configurations: CERs, groups of self-consumers, remote self-consumers | Premium tariff for 20 years on shared energy: a fixed part of 60 to 80 euros/MWh depending on size, plus a variable part of up to 40 euros/MWh | 31 December 2027 | Open |
| GSE Ritiro Dedicato (and the end of Scambio sul Posto) | Producers with solar PV systems of any capacity | The hourly market price for your zone for every kWh fed in, with a guaranteed minimum price for smaller systems | no closing date | Open |
| PN RIC FTV Sud - Solar PV and thermal-PV for businesses in the South | Businesses of every size with production units in Basilicata, Calabria, Campania, Molise, Puglia, Sardegna and Sicilia (applications closed) | Solar PV: up to 65% (small), 55% (medium-sized), 45% (large) with the uplifts (closed) | 3 July 2026 | Closed |
| Renewable self-generation in SMEs (MIMIT, recovery plan) | SMEs across Italy (applications closed on 10 November 2025) | Up to 40% for micro and small businesses, 30% for medium-sized ones, on spending from 30,000 euros to 1 million (closed) | 10 November 2025 | Closed |
| Transizione 5.0 tax credit (2024-2025) | Only businesses that already applied by the end of 2025 | Closed. For those left out: 89.77% of the credit on 4.0 assets, a separate grant for the solar PV | 31 December 2025 | Closed |
The incentives in detail
Open an entry for requirements, steps, documents and mistakes to avoid. Every entry carries its official sources at the end.
OpenTax reliefEnhanced depreciation 2026-2028 (Nuovo Piano Transizione 5.0)
You can deduct from income tax more than you spent: the cost of a solar PV system for self-consumption is uplifted by 180% on the portion up to 2.5 million euros. It applies to systems completed between 1 January 2026 and 30 September 2028.Worth: 180% of the cost up to 2.5 million eurosCloses: 30 September 2028Show the details
System completed (work finished) by 30 September 2028; completion report by 15 November 2028.
Who can claim it
- Anyone with business income who invests in assets used in production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in Italy: resident businesses and permanent establishments of foreign businesses, whatever their legal form, sector or size.
- Farms: what counts is how you determine your income. The law refers to «persons with business income»; those who cannot use enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) have a dedicated agricultural tax credit (see the Agriculture page).
Who is excluded
- Businesses in voluntary liquidation, bankruptcy, compulsory administrative liquidation, composition with creditors without business continuity or any other insolvency procedure, even where it is only being declared.
- Businesses subject to disqualifying sanctions (legislative decree 231/2001).
- For those who qualify, the benefit applies only if they comply with workplace safety rules and pay their employees' social contributions correctly.
How much it is worth
- 180% on the portion of the investment up to 2.5 million euros.
- 100% on the portion above 2.5 and up to 10 million euros.
- 50% on the portion above 10 and up to 20 million euros.
- It is not a tax credit to be used on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form: it is an extra (off-book) deduction on depreciation charges (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) or lease instalments, which reduces the taxable base for income tax only.
- The benefit starts from the tax year in which you file the completion report with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.), if the system entered service in that same year and after the GSE checks have come back positive.
Eligible costs
- The electricity generating units (modules and system components).
- The transformers upstream of the grid connection point and the meters for the energy produced.
- The system's auxiliary services.
- The storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.) connected to the installation, up to a ceiling: 2 times the eligible value of the system up to 20 kW, 1.5 times up to 600 kW, 1.2 times up to 1,000 kW, 1 time above that.
- Each system has a maximum eligible cost, set by the decree by size and by module type (Annex 1): spending above that ceiling is not uplifted.
Requirements for solar PV
- The energy produced must serve the business's own consumption, including at a distance.
- The system may produce at most 105% of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s energy needs, calculated on the average annual consumption of the previous year. Those needs also include gas or other fuels used for heat, converted with the formulas in the decree.
- The system stands on the same land-registry parcels as the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.), or on different parcels if it is connected to the grid through an existing POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.) (the code of the delivery point) of the same facility.
- Modules: for solar, only systems with modules listed in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) of photovoltaic technologies, section b) or section c), qualify (article 12 of decree-law 181/2023). The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) platform only provides these two fields.
- Section b): modules with cells made in the European Union, with cell efficiency of at least 23.5%. Section c): modules made in the European Union with bifacial heterojunction or tandem cells made in the European Union, with cell efficiency of at least 24.0%.
Combining it with other incentives
- You can add it to other national or European incentives on the same costs, provided the support does not cover the same shares of the cost and the total does not exceed the cost incurred.
- The uplift is calculated on the cost net of other grants received for the same costs: for example, if a regional call covers part of the spend, the 180% applies only to the rest.
- It does not apply to investments using the deduction in article 1, paragraph 446, of law 207/2024.
- Text read in the original version of the law in the Official Gazette: later amendments (decree-law 38/2026) are being checked.
How to apply
- 1Get your consumption figures ready. Collect the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s electricity (and heat) consumption for the previous year and the POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.): they are needed to show that the system does not exceed 105% of the facility's needs.
- 2Advance report. On the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s «Nuovo Piano Transizione 5.0» portal (Customer Area, with SPID or CIE) you book the benefit: details of the business and of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.), the expected amount, the expected dates for finishing the work and entering service. The platform has been open since 12 June 2026.
- 3Confirmation report. Within 60 days of a positive outcome on the advance report you confirm the investment, with the date and amount of the payment that brings the down payment to at least 20% of the cost of each asset, and the invoice details. You cannot add assets and the costs can only go down.
- 4Completion report. Once the system is in service, and in any case by 15 November 2028, you file the completion report with the invoices and declare that you hold the sworn technical report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.) and the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.).
- 5Annual reports. From the first report and for as long as the benefit lasts: a periodic report by 20 January each year, and by 30 June the supplement with the depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) schedule.
Documents
- Annual electricity consumption (and any heat consumption) of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in the previous year.
- Invoices for the eligible costs and proof of payment of the down payment of at least 20%.
- A sworn technical report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.) by an engineer or industrial surveyor on the professional register, or a certificate from an accredited certification body.
- Accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) by a statutory auditor (including for businesses not required to have an audit).
- Registration of the modules in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) (section b or c).
- The lease contract and the purchase order, if the system is on a finance lease.
Mistakes that cost you the benefit
- Counting on the 180% for the part of the spend already covered by a grant: the uplift is calculated net of other grants on the same costs.
- Sizing the system above 105% of your needs: the excess part does not qualify.
- Ordering modules not listed in sections b) or c) of the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.).
- Missing a deadline (60 days for the confirmation, 10 days for supplements, 15 November 2028 for the completion): the benefit is lost.
- Thinking it is a credit to offset on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form: it is a deduction from income tax, and you need taxable profits.
- Selling the system or moving it abroad during the depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) period without replacing it with a similar asset: the benefit is forfeited.
- Not keeping the sworn report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.), the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.), the invoices and the delivery notes for inspections.
Example: on an investment of 100,000 euros
A solar PV system for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), completed in 2027, with an eligible cost of 100,000 euros. With the 180% uplift the business deducts 280,000 euros in all instead of 100,000, spread over the years of depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.). The real saving is the extra deduction multiplied by the income tax rate you pay: work it out with your accountant.
| Eligible cost | 100,000 euros |
|---|---|
| 180% uplift | +180,000 euros |
| Total deductible | 280,000 euros |
| On 3,000,000 euros | +4,500,000 (180% on 2.5 million) +500,000 (100% on 0.5 million) |
Official sources
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 427, 428, 429 e 431 (testo originario)
- MIMIT — Scheda «Nuovo Piano Transizione 5.0 - Iperammortamento», aggiornata al 15 ottobre 2026
- GSE — Nuovo Piano Transizione 5.0: chi può accedere, calcolo del beneficio, come accedere
- MIMIT-MEF — Decreto interministeriale 7 maggio 2026, artt. 3, 4, 6, 7, 8, 10 e Allegato 1
- GSE — Guida all'utilizzo della piattaforma NPTR5 (15 ottobre 2026), sezione impianti FER
- Normattiva — Decreto-legge 9 dicembre 2023, n. 181, art. 12, comma 1 (Registro ENEA dei moduli)
Checked on 19 November 2026
OpenTax reliefZES unica tax credit for southern Italy 2026-2028
If your business invests in a production facility inside the ZES unica (southern Italy plus Abruzzo, Marche and Umbria, in the assisted areas only), you can get a tax credit of up to 70% of the investment: that is the maximum, for small businesses in the Puglia areas covered by the Just Transition Fund. The percentage you will actually use is set by the Agenzia delle Entrate once it has counted all the applications for the year.Worth: Up to 70%, then cut in proportion to demandCloses: 31 December 2028Show the details
Investments up to 31 December 2028. For 2027 investments the report is filed between 31 March and 30 May 2027; the one for 2026 closed on 30 May 2026.
Who can claim it
- All businesses, whatever their legal form and accounting regime, already trading or setting up in the ZES unica.
- What counts is where the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) is, not the registered office: a business based outside the ZES can claim the credit for a plant inside it.
- Regions: Basilicata, Calabria, Campania, Molise, Puglia, Sardegna, Sicilia, Abruzzo, Marche and Umbria, only in the assisted areas set out in the 2022-2027 Regional Aid Map.
- Retail can apply: it is not among the excluded sectors.
Who is excluded
- Businesses in energy generation, storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.), transmission and distribution and in energy infrastructure. What counts is the ATECO business activity code of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) where you invest.
- The steel, coal and lignite industries; broadband; the banking, financial and insurance sectors.
- Transport and its infrastructure. Warehousing and transport support services, on the other hand, are eligible.
- Primary agricultural producers and fisheries and aquaculture businesses: they have a separate ZES credit.
- Businesses in liquidation, being wound up, or in difficulty under the European rules.
- Projects with a total cost below 200,000 euros.
How much it is worth
- Small businesses, projects up to 50 million euros: 60% in Campania, Puglia, Calabria and Sicilia; 50% in Basilicata, Sardegna and Molise; 35% in Abruzzo, Marche and Umbria (non-predefined «c» areas).
- Small businesses in the Just Transition Fund areas: 70% in Puglia, 60% in Sardegna.
- Medium-sized businesses, projects up to 50 million euros: 50% in Campania, Puglia, Calabria and Sicilia; 40% in Basilicata, Sardegna and Molise; 25% in Abruzzo, Marche and Umbria; 60% in the Puglia areas covered by the Just Transition Fund.
- Large businesses: 40% in Campania, Puglia, Calabria and Sicilia; 30% in Basilicata, Sardegna and Molise; 15% in Abruzzo, Marche and Umbria; 50% in the Puglia areas covered by the Just Transition Fund.
- Maximum eligible investment: 100 million euros per project. Minimum investment: 200,000 euros.
- Reduction: the credit you actually use is the credit accrued multiplied by a percentage that the Agenzia delle Entrate publishes after the supplementary reports. The percentage is the ratio between the year's funds and the total credits claimed.
- Funds available: 2,300 million euros for 2026, 1,000 million for 2027, 750 million for 2028.
- In past years the percentage was 100% in 2024 and 60.3811% in 2025. The 2026 figure will be published within ten days of the deadline for the supplementary reports on 17 January 2027.
Eligible costs
- New machinery, plant and equipment used in a production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) inside the ZES unica, including on a finance lease (what counts is the cost paid by the leasing company, excluding maintenance).
- Purchase of land and purchase, construction or extension of business premises, provided land and buildings do not exceed 50% of the eligible investment.
- The investments must be part of an initial investment project (the definition is in EU regulation 651/2014, article 2, points 49, 50 and 51).
- Goods held for resale, consumables and purchases between linked or controlled businesses are not eligible.
Requirements for solar PV
- A solar PV system is new «plant»: it can enter the credit only if it is part of an initial investment project for the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) inside the ZES unica.
- No official document from the Agenzia delle Entrate or the ZES Authority deals specifically with solar PV for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.). If the project consists of the solar PV system alone, ask your accountant for confirmation or file a formal ruling request with the Agenzia before ordering.
- If the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) has an energy-generation ATECO code, you are excluded: a business whose main activity is selling the energy it produces cannot use it.
- The system must enter service by the second tax period after the purchase and stay in the facility for at least five tax periods, otherwise the credit is reduced.
Combining it with other incentives
- With de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) aid and other State aid on the same costs: yes, provided the total does not exceed the maximum aid intensity set by the European rules for that area.
- With measures that are not State aid: yes, within the limits of the cost actually incurred.
- With enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.): the 2026 budget act allows it only if the two forms of aid do not cover the same shares of the cost and do not exceed the cost incurred; the uplift is also calculated net of grants received for the same costs. We found no specific official clarification on ZES plus enhanced depreciation: have your accountant confirm the calculation.
How to apply
- 1Check the area and the sector. Check that the municipality of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) is in an assisted area of the ZES unica and that the facility's ATECO code is not among those excluded.
- 2Do not commit too early. Only projects started after the measure came into force are eligible. The start is the first legally binding commitment to order the assets.
- 3Report to the Agenzia delle Entrate. For 2027 investments you file the report between 31 March and 30 May 2027, with the costs already incurred and those planned up to 31 December 2027. Only the Agenzia's free software may be used, either directly or through an authorised intermediary.
- 4Supplementary report. On pain of forfeiture, between 3 and 17 January of the following year you confirm the investments made, with the electronic invoices, the credit accrued and the details of the auditor's certificate. The amount cannot exceed the one in the first report. For 2026 investments the window runs from 3 to 17 January 2027.
- 5Use the credit on an F24 form. You offset it on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form only after the order setting the percentage and after the Agenzia's second receipt, and you report it in your tax returns until you have used it all.
Documents
- Electronic invoices for the investments.
- A certificate from a statutory auditor listed in section A of the auditors' register, certifying the costs incurred.
- The lease contract, if the system is on a finance lease.
- The ATECO code of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) where you invest.
Mistakes that cost you the benefit
- Skipping the supplementary report in January: everything is lost.
- Working out the return on the full 60% or 70%: the credit is multiplied by the Agenzia's percentage, which in 2025 was 60.3811%.
- Filing a project below 200,000 euros.
- Moving or selling the system within five tax periods, or closing the business in the ZES less than five years after completion.
- Taking it for granted that a solar PV system on its own counts as an initial investment.
Example: on an investment of 1,000,000 euros
A small business in Campania invests 1,000,000 euros in an eligible project carried out in 2027. The credit accrued is 60%. The credit it will actually use depends on the percentage the Agenzia publishes in early 2028: the rows show two cases already seen in past years.
| Credit accrued (60%) | 600,000 euros |
|---|---|
| With a percentage of 100% (as in 2024) | 600,000 euros |
| With a percentage of 60.3811% (as in 2025) | 362,287 euros |
Official sources
- Agenzia delle Entrate — Scheda «Credito d'imposta per investimenti nella ZES unica (ZES 2026) - Che cos'è», aggiornata al 30 gennaio 2026
- Agenzia delle Entrate — Scheda ZES 2026 - Come e quando
- Struttura di missione ZES - Dipartimento per il Sud — Pagina «Credito di imposta»: tabella delle intensità per regione e dimensione d'impresa
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 438-443 e comma 431
- Normattiva — D.L. 19 settembre 2023, n. 124, art. 16, testo vigente
- Agenzia delle Entrate — FAQ ZES unica dell'11 luglio 2024: settori, codice ATECO, sede legale
- Agenzia delle Entrate — Risposta a interpello n. 169/2026: principio di incentivazione
- Agenzia delle Entrate — Provvedimento prot. n. 56564/2026: percentuale 2025 pari al 60,3811%
Checked on 19 November 2026
OpenTax reliefZLS tax credit - Simplified logistics zones 2026-2028
This is a tax credit similar to the ZES unica one, for businesses investing in the Simplified Logistics Zones (ZLS) listed by the Agenzia delle Entrate in Veneto, Emilia-Romagna, Liguria, Toscana, Lombardia, Friuli-Venezia Giulia and Lazio. It applies to investments from 1 January 2026 to 31 December 2028, at the maximum rate allowed by the Regional Aid Map for that area, reduced in proportion to demand.Worth: The maximum intensity in the Regional Aid Map, reduced in proportion to demandCloses: 31 December 2028Show the details
For 2027 investments the report is filed between 31 March and 30 May 2027; the one for 2026 closed on 30 May 2026. Supplementary reports are filed from 3 to 17 January of the following year.
Who can claim it
- Businesses investing in existing or new production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) inside an established Simplified Logistics Zone.
- Only in the parts of the ZLS eligible for regional aid (areas under article 107(3)(c) of the EU Treaty).
- ZLS listed by the Agenzia delle Entrate: Veneto - Port of Venezia-Rodigino, Emilia-Romagna, Port and Hinterland of Genova, Toscana, Lombardia, Friuli-Venezia Giulia, Lazio, Port and Hinterland of La Spezia (the last from 19 January 2026).
- The list of eligible municipalities is on the website of the Department for Cohesion Policies.
Who is excluded
- Projects with a total cost below 200,000 euros.
- The parts of a ZLS outside the areas eligible for regional aid.
How much it is worth
- The credit is equal to the maximum rate allowed by the 2022-2027 Regional Aid Map for the area where the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) stands.
- Maximum eligible investment: 100 million euros per project. Minimum: 200,000 euros.
- Funds: 100 million euros for each of the years 2026, 2027 and 2028.
- The credit you actually use is the credit accrued multiplied by a percentage published by the Agenzia delle Entrate: the year's funds divided by the credits claimed. If demand is below the funds available, the percentage is 100%.
Eligible costs
- Purchase of capital assets for existing or new production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in the ZLS.
Requirements for solar PV
- No official document we read deals specifically with solar PV in the ZLS: the same cautions as for the ZES unica apply. Ask for confirmation before filing a project consisting of the system alone.
Combining it with other incentives
- With de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) aid and other State aid on the same costs: yes, within the maximum intensity set by the European rules.
- With measures that are not State aid: yes, within the limits of the spend incurred.
How to apply
- 1Check the municipality. Check on the website of the Department for Cohesion Policies that the municipality, or the part of it, is in the ZLS and in the eligible areas.
- 2Report to the Agenzia delle Entrate. For 2027 investments you file it between 31 March and 30 May 2027, with the costs incurred and those planned up to 31 December 2027, using the Agenzia's free software.
- 3Supplementary report. On pain of forfeiture, between 3 and 17 January of the following year you confirm the investments made, with the details of the auditor's certificate.
Documents
- Invoices for the investments.
- A certificate of the costs issued by an auditor listed in section A of the auditors' register.
Mistakes that cost you the benefit
- Taking it for granted that the whole ZLS is eligible: only the «c» areas of the Regional Aid Map count.
- Skipping the supplementary report in January: the credit is lost.
Official sources
- Agenzia delle Entrate — Scheda «ZLS 2026 - Che cos'è», aggiornata al 23 marzo 2026
- Agenzia delle Entrate — Scheda «ZLS 2026 - Come e quando»
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 444-447
Checked on 19 November 2026
OpenSubsidised loanNuova Sabatini (MIMIT capital assets scheme)
If you are an SME, you can fund the purchase of new capital assets with a bank loan or a 5-year lease (from 20,000 euros to 4 million), and the Ministry gives you back part of the interest as a grant. A solar PV system is eligible only on certain conditions: if energy is your business, if you are a farm, or if it is part of a wider investment programme consistent with your business.Worth: A loan from 20,000 euros to 4 million over 5 years + a grant equal to interest at 2.75% (ordinary) or 3.575% (green and 4.0)Closes: The Ministry gives no closing date and publishes the funds still available. As at 16 November 2026, 1,069,629,897.19 euros are available for the Nuova Sabatini. The 2026 budget act added 200 million for 2026 and 450 million for 2027.Show the details
Who can claim it
- Micro, small and medium-sized businesses duly set up and listed in the Business Register (or in the Fisheries Business Register).
- With a registered office or local unit in Italy.
- All productive sectors, agriculture and fisheries included.
- For the Capitalisation strand: SMEs set up as companies, committed to a capital increase.
Who is excluded
- Large businesses.
- The financial and insurance sector (section L of the ATECO 2025 classification).
- Businesses in difficulty, in voluntary liquidation or in insolvency proceedings aimed at winding up.
- Businesses that have not repaid aid declared unlawful by the European Commission.
How much it is worth
- The participating bank or leasing company grants a loan of no more than 5 years, between 20,000 euros and 4 million euros, which can cover the whole investment.
- The loan can be guaranteed by the SME Guarantee Fund for up to 80%.
- The Ministry gives you a capital grant equal to the interest calculated, on a notional basis, on a 5-year loan of the same amount as the investment.
- A notional rate of 2.75% for ordinary investments.
- A notional rate of 3.575% for green investments (machinery, plant and equipment with a low environmental impact, with process or product environmental certification) and for 4.0 investments.
- Capitalisation strand (with a capital increase): 5% for micro and small businesses, 3.575% for medium-sized ones.
- The grant is paid in annual instalments within the sixth year after the end of the investment; in a single payment if the approved loan does not exceed 200,000 euros.
- Maximum aid intensity (general sector): 20% for small businesses and 10% for medium-sized ones; 65% in the agricultural sector.
Eligible costs
- Brand new machinery, plant, capital assets, equipment, hardware, software and digital technologies.
- Assets classifiable under balance sheet items B.II.2 (plant and machinery), B.II.3 (equipment) and B.II.4 (other assets).
- Land and buildings, used or refurbished assets, assets under construction and advance payments are not eligible.
Requirements for solar PV
- An energy generating system is eligible for businesses that generate electricity (ATECO code 35.11) or that carry on an agricultural activity.
- Other SMEs can fund a solar PV system only if it forms part of a wider investment programme consistent with the business's activity.
- General plant and the building works to install it are eligible only if strictly functional to the production process and included in a wider investment programme.
- The assets must be functionally autonomous and connected to the business's productive activity.
- For the green grant a process or product environmental certification is required (or a suitable environmental self-declaration).
Combining it with other incentives
- It can be combined with other State aid on the same costs, de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) aid included, provided the total does not exceed the maximum aid intensity or amount set by the European block exemption regulations for your activity.
- Careful: some solar PV measures (for example Autoproduzione FER in SMEs and PN RIC FTV Sud) forbid combination with other State aid on the same costs.
How to apply
- 1Fill in the application on the platform. The grant application is filled in on the benistrumentali.dgiai.gov.it platform.
- 2Take it to the bank or leasing company. You take the application to a bank or an intermediary party to the agreement, together with the loan request.
- 3Wait for the approval and the award. The bank checks the documents, reserves the funds with the Ministry and approves the loan. The Ministry issues the decision awarding the grant.
- 4Carry out and pay for the investment. Once the investment is finished and paid for in full, you fill in the payment claim (form RU) on the platform.
- 5Claim the annual instalments. If the grant is paid in instalments, you file the payment request on the platform each year.
Documents
- The grant application filled in on the Ministry's platform.
- The documents the bank requires to approve the loan.
- For the green grant: process or product environmental certification, or an environmental self-declaration.
- At the end of the investment: the payment claim (form RU) with the documentation required.
Mistakes that cost you the benefit
- Applying for the Sabatini for a stand-alone solar PV system, not part of a wider investment programme (unless you are an energy producer or a farm).
- Buying used or refurbished assets.
- Adding other State aid and exceeding the maximum aid intensity allowed.
- Forgetting the environmental certification when claiming the green grant.
Official sources
- MIMIT — Beni strumentali – Nuova Sabatini, pagina della misura (ultima modifica 16 novembre 2026)
- MIMIT — Avviso: rifinanziamento per 650 milioni di euro (legge di bilancio 2026)
- Invitalia — FAQ Nuova Sabatini – Spese ammissibili, domande 2, 3 e 5
- Invitalia — FAQ Nuova Sabatini – Limiti di intensità di aiuto e cumulabilità, domande 1 e 2
Checked on 19 November 2026
OpenFeed-in tariffGSE premium tariff for shared energy (energy communities and distributed self-consumption)
If your solar PV system is part of a renewable energy community (CER), of a group of self-consumers, or is a remote self-consumer, the GSE pays a premium tariff on the shared energy for 20 years. You can apply until 31 December 2027, or earlier if 5 GW of incentivised capacity is reached.Worth: Premium tariff for 20 years on shared energy: a fixed part of 60 to 80 euros/MWh depending on size, plus a variable part of up to 40 euros/MWhCloses: 31 December 2027Show the details
It can be applied for up to the thirtieth day after 5 GW of incentivised capacity is reached, and in any case no later than 31 December 2027. The application must be filed within 120 days of the system entering service.
Who can claim it
- Renewable energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) (CER): members or shareholders can be individuals, small and medium-sized businesses (SMEs), associations, third-sector bodies, religious bodies, research bodies and local authorities.
- SMEs can take part in a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) only if that participation is not their main commercial or industrial activity.
- Groups of self-consumers (for example in an apartment building or in a building with a single owner).
- Remote self-consumers (a single customer using the energy from their own system sited elsewhere, under the same primary substation).
- The application is filed by the configuration's Referent (the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) itself, the apartment building through its manager, the self-consumer) or, under a mandate, by a member of the configuration or by an ESCO certified to UNI 11352.
Who is excluded
- Large businesses cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
- Central government bodies cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
- Private businesses whose main ATECO code is 35.1, 35.11.00, 35.12.00 or 35.15.00 cannot be members or shareholders of a CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.).
- Businesses in difficulty and businesses with an outstanding State aid recovery order.
- Systems with capacity above 1 MW: they only receive the valorisation payment on self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) energy, not the premium tariff.
- The share of capacity installed to meet the renewables obligation in new or renovated buildings (the so-called mandatory capacity) does not receive the premium tariff.
How much it is worth
- The premium tariff has a fixed part that depends on the system's capacity and a variable part that rises when the zonal energy price (the wholesale market price in your zone) falls below 180 euros/MWh.
- Systems up to 200 kW: 80 euros/MWh plus the variable part, capped at 120 euros/MWh.
- Systems above 200 kW and up to 600 kW: 70 euros/MWh plus the variable part, capped at 110 euros/MWh.
- Systems above 600 kW: 60 euros/MWh plus the variable part, capped at 100 euros/MWh.
- For solar PV there is a geographical uplift: +4 euros/MWh in the central Regions (Lazio, Marche, Toscana, Umbria, Abruzzo) and +10 euros/MWh in the northern Regions (Emilia-Romagna, Friuli-Venezia Giulia, Liguria, Lombardia, Piemonte, Trentino-Alto Adige, Valle d'Aosta, Veneto).
- The tariff runs for 20 years from the date the system enters commercial operation and stays unchanged throughout.
- On top of the premium tariff, the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays the valorisation payment set by ARERA on self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) energy (the refund of certain components of the bill).
- The energy fed into the grid stays yours: you can sell it on the market or transfer it to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) under Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
- If you also receive a capital grant (up to 40%), the tariff is reduced in proportion: by up to half where the grant is 40%.
- The reduction for a capital grant does not apply to energy shared from the delivery points of local authorities, religious bodies, third-sector and environmental protection bodies and individuals.
Requirements for solar PV
- Each system (or extension) must have a capacity no greater than 1 MW.
- The systems and the consumers in the configuration must be connected under the same primary substation (the local electricity substation: check it on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s interactive map).
- The system must be new or an extension of an existing one; for extensions the tariff applies only to the new section.
- The system must have entered service on or after 16 December 2021 and, for CERs, after the community was duly set up.
- For solar PV all the components must be newly built.
- You must comply with the DNSH principle (Do No Significant Harm to the environment) under the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Operating Rules.
- The systems must be at the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s disposal and under its control, even where a third-party producer makes them available.
- The part of the tariff above the shared-energy threshold (55%, or 45% where there is also a capital grant) must go to consumers other than businesses or to social purposes in the local area: this must be written into the statutes or into an agreement.
Combining it with other incentives
- Can be combined with the recovery plan grant under the CACER decree: the tariff is reduced in line with the grant obtained.
- Can be combined with other capital grants up to 40% of the eligible investment costs: the tariff is reduced.
- Can be combined with other State aid that is not a capital grant, if its value does not exceed 40% of the reference investment cost: the tariff is reduced.
- Can be combined with no reduction with grants for pre-feasibility studies alone and for the costs of setting up the configuration.
- Can be combined with no reduction with the ordinary tax deductions for homes (article 16-bis, paragraph 1, letter h, of the consolidated income tax act).
- Can be combined with no reduction with other forms of public support other than capital grants that are not State aid.
- Cannot be combined with other operating incentives (paid on the energy), with the Superbonus, or with capital grants or other State aid above 40% of the eligible costs.
- An alternative to Scambio sul Posto.
How to apply
- 1Set up the configuration. A CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) needs a legal entity with compliant statutes (at least two members and two separate connection points). A group of self-consumers needs the building or the apartment building. Check on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) map that all the points are under the same primary substation.
- 2If you wish, ask for a preliminary check. It is optional and costs 100 euros. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) replies within 60 days with an opinion or with the requirements to follow.
- 3Bring the system into service. For CERs the system must enter service after the community has been set up.
- 4File the application with the GSE within 120 days. The Referent files it online only, through the SPC-Comunità Energetiche e Autoconsumo portal in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area, with the documents in Annex 3 of the Operating Rules. If you are late, you lose the tariff for the period between entering service and the application.
- 5Wait for the outcome. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) completes its assessment by the last day of the third month after the application. It then pays monthly amounts on account and a balancing payment the following year.
Documents
- The CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.)'s statutes or deed of incorporation with the elements the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) requires.
- The mandate to the Referent, where the referent is not the configuration itself.
- Documentation of the systems and the configuration listed in Annex 3 of the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Operating Rules.
- DNSH check sheets.
Mistakes that cost you the benefit
- Filing the application more than 120 days after entering service: you lose the tariff for the months of delay.
- Bringing the system into service before the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) has been set up.
- Connecting systems and consumers to different primary substations.
- Including a large business in the CER (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.), or an SME whose main activity is energy.
- Forgetting the clause in the statutes on allocating the excess tariff to consumers other than businesses or to social purposes.
Official sources
- GSE — Configurazioni per l'autoconsumo diffuso – Corrispettivi e tariffa, sezioni tariffa premio e cumulabilità
- GSE — Configurazioni per l'autoconsumo diffuso – impianti ammessi e termine di richiesta
- GSE — Comunità energetiche rinnovabili – chi può far parte di una CER, statuto
- GSE — Come accedere – richiesta sul portale SPC e verifica preliminare
- GSE – testo del decreto — DM MASE 7 dicembre 2023, n. 414, artt. 1, 3, 4, 5, 6 e Allegato 1
- MASE — DM MASE 16 maggio 2025, n. 127, art. 1, comma 1, lettera f) (Allegato 1, paragrafo 3)
Checked on 19 November 2026
OpenFeed-in tariffGSE Ritiro Dedicato (and the end of Scambio sul Posto)
With Ritiro Dedicato you sell the GSE the energy your system feeds into the grid and does not consume, at market prices, without going to the exchange. For systems that entered service after 29 May 2025 it is the simple way to get value from the energy fed in, because Scambio sul Posto is no longer available.Worth: The hourly market price for your zone for every kWh fed in, with a guaranteed minimum price for smaller systemsCloses: The service is always available. The contract runs for a calendar year and renews itself; you can withdraw with at least 60 days' notice.Show the details
Who can claim it
- Systems powered by renewable sources with a nominal apparent capacity below 10 MVA.
- Solar (photovoltaic), wind, geothermal, wave, tidal and run-of-river hydroelectric systems of any capacity.
- Systems that are part of energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) or groups of self-consumers can also transfer the energy fed in through Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
Who is excluded
- Systems receiving an all-inclusive tariff (incentive and sale of the energy together), for example solar PV supported under the fifth Conto Energia (decree of 5 July 2012).
- Systems using Scambio sul Posto: the two services are not compatible.
- Systems that entered service after 29 May 2025 can no longer access Scambio sul Posto: Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) (or selling on the market) remains for them.
How much it is worth
- The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays you for every kWh fed into the grid at the hourly zonal price, that is the market price in your zone in the hour you feed it in.
- If the renewable system receives no incentive and has a capacity of up to 1 MW, or if it is a supported solar PV system up to 100 kW, you can choose the guaranteed minimum price set each year by ARERA: in 2026 it is 4.75 euro cents per kWh for up to 1,500,000 kWh taken in a year.
- With the guaranteed minimum price you receive a balancing payment the following year if the hourly zonal price has been higher: you always get the better of the two.
- As a guide: in the first quarter of 2026 the average hourly zonal price paid to a renewable system was 12.8 euro cents per kWh, and 11.5 cents in 2025. These are averages: the real price changes every hour and by zone.
- Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) revenue is added to that from other incentives, except all-inclusive tariffs.
- The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) pays monthly, two months after the month concerned.
Requirements for solar PV
- With the Modello Unico (the simplified procedure through the grid operator) the solar PV system must: have a capacity of up to 200 kW; be installed at a customer who already has an active low or medium voltage withdrawal point; stand on the roof of a building or on other above-ground structures; and request Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) together with the connection.
- In all other cases the standard route is used, applying to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) within 60 days of entering service.
Combining it with other incentives
- It can be combined with the premium tariff for energy communities (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.) and distributed self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.): the energy fed in stays the producer's, who can transfer it to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) through Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.).
- The revenue is added to that from other incentive schemes, except those with an all-inclusive tariff.
- It is not compatible with Scambio sul Posto.
How to apply
- 1System up to 200 kW on a roof: Modello Unico. If you already have an active withdrawal point, ask for Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) together with the connection through the grid operator. The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) starts the contract from the date the connection is activated.
- 2In other cases: apply within 60 days. Within 60 days of entering service, file the application from the Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.) (RID) portal in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area, with the technical and administrative details.
- 3Choose the price. When applying you choose between the hourly zonal price and the guaranteed minimum price, if your system can have it.
- 4Invoice, if you are required to. If you have to issue an invoice, you issue it from the RID portal by the month after the month of production, otherwise payment is delayed.
Documents
- The system's technical and administrative details, entered on the RID portal.
- An up-to-date IBAN in the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) Customer Area.
Mistakes that cost you the benefit
- Still counting on Scambio sul Posto for a new system: it is no longer available for systems that entered service after 29 May 2025.
- Filing the standard application more than 60 days after entering service.
- Not issuing the invoice from the RID portal in time: payment is delayed.
- A wrong or out-of-date IBAN in the Customer Area.
Official sources
- GSE — Ritiro dedicato – Cos'è e chi può accedere
- GSE — Ritiro dedicato – Come accedere (Modello Unico e modalità standard)
- GSE — Ritiro dedicato – Regolazione economica del servizio, prezzi 2026
- GSE — News 6 marzo 2025 – Scambio sul posto, stop al meccanismo
- ARERA — Delibera 4 marzo 2025, 78/2025/R/efr, in attuazione dell'art. 9, comma 2, del D.Lgs. 199/2021
- GSE — Ritiro dedicato secondo l'Allegato A alla deliberazione ARERA 280/07 e s.m.i.
Checked on 19 November 2026
ClosedNon-repayable grantPN RIC FTV Sud - Solar PV and thermal-PV for businesses in the South
This was a non-repayable grant for solar PV systems for self-consumption at production units in southern Italy, up to 65% for small businesses with the uplifts. The GSE window closed on 3 July 2026: you cannot apply today.Worth: Solar PV: up to 65% (small), 55% (medium-sized), 45% (large) with the uplifts (closed)Closes: 3 July 2026Show the details
The window on the GSE's PNRIC-FTV portal ran from 10 a.m. on 3 December 2025 to 10 a.m. on 3 July 2026 (deadline extended by MASE directorial decree no. 33 of 18 February 2026).
Who can claim it
- All types of business that have the use of the production unit.
- The production unit must stand in an industrial, production or craft area of a municipality with more than 5,000 residents in Basilicata, Calabria, Campania, Molise, Puglia, Sardegna or Sicilia.
- 60% of the 262 million euros was earmarked for SMEs; a quarter of that share for small businesses alone.
Who is excluded
- Production units in municipalities of up to 5,000 residents.
- Production units outside the seven eligible Regions.
How much it is worth
- Solar PV, base grant: 58% for small businesses, 48% for medium-sized ones, 38% for large ones.
- Uplifts: +2% with ISO 50001 certification; +2% with modules listed in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) in class A; +5% with modules in class B or C.
- Maximum with the uplifts: 65% for small, 55% for medium-sized and 45% for large businesses.
- Thermal-PV: base 63%, 53% and 43%; maximum 65%, 55% and 45%.
- Storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.): base 48%, 38% and 28%; maximum 50%, 40% and 30%.
- The energy fed in and not self-consumed (The energy the system produces and you use on site, instead of feeding it into the grid.) is taken by the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) for 20 years and its value goes to the national Reddito energetico Fund, not to the business.
Eligible costs
- Building or upgrading solar PV and/or thermal-PV systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.).
- Any storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.) connected to the installation.
Requirements for solar PV
- System capacity between 10 kW and 1,000 kW.
- The energy produced must be used for the production unit's own consumption.
Combining it with other incentives
- It cannot be combined, on the same costs, with other State aid, de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) aid included.
- It can be combined with support that is not State aid, provided the total does not exceed the eligible cost.
- The ban on double funding that applies to European funds (EU regulation 2021/1060) holds here too.
How to apply
- 1Applications closed. The window closed on 3 July 2026. Applications are assessed by the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) in order of score; awards are notified by the MASE.
Mistakes that cost you the benefit
- Adding this grant to other State aid, de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) included, on the same costs.
Official sources
- GSE — PN RIC FTV SUD – Cos'è
- GSE — PN RIC FTV SUD – L'agevolazione (tabelle percentuali)
- GSE — PN RIC FTV SUD – Modalità di accesso (sportello 3 dicembre 2025 – 3 luglio 2026)
- MASE — Notizia: decreto direttoriale n. 33 del 18 febbraio 2026, proroga al 3 luglio 2026
- MASE — Avviso pubblico per la selezione di progetti per autoproduzione di energia da FER – requisiti e cumulo delle agevolazioni
Checked on 19 November 2026
ClosedNon-repayable grantRenewable self-generation in SMEs (MIMIT, recovery plan)
This was a non-repayable grant for SMEs installing solar PV or small wind for self-consumption, with optional storage: up to 40% for micro and small businesses and up to 30% for medium-sized ones. The window closed on 10 November 2025 and the rankings are published: you cannot apply today.Worth: Up to 40% for micro and small businesses, 30% for medium-sized ones, on spending from 30,000 euros to 1 million (closed)Closes: 10 November 2025Show the details
The second window was open from 12 noon on 8 July 2025 to 12 noon on 10 November 2025 (after an extension). The first window had been open from 4 April to 17 June 2025. The ranking for the second window was published on 14 May 2026.
Who can claim it
- Micro, small and medium-sized businesses operating anywhere in Italy.
- 40% of the funds was reserved for the Regions Abruzzo, Basilicata, Calabria, Campania, Molise, Puglia, Sardegna and Sicilia, and a further 40% for micro and small businesses.
Who is excluded
- Large businesses.
- Businesses in the coal sector.
- Businesses in the primary production of agricultural products, fishing and aquaculture.
- Businesses whose activity does not comply with the DNSH principle (Do No Significant Harm to the environment).
How much it is worth
- A capital grant awarded through a ranking.
- Investment programmes with eligible costs from 30,000 euros to 1 million euros.
- 40% for micro and small businesses.
- 30% for medium-sized businesses.
- 30% for any energy storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.).
- 50% for the energy audit.
- Total funds for the measure: 320 million euros. The first window took up 133,331,907 euros; 178,668,093 euros were left for the second.
Eligible costs
- Solar PV or small wind systems for immediate self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.).
- Behind-the-meter storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.) for deferred self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.).
- Energy audit: under the decree of 3 December 2025 it is no longer compulsory before the application, but it remains an eligible cost.
Requirements for solar PV
- The energy produced must serve the business's own self-generation for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) (immediate, or deferred with storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.)).
Combining it with other incentives
- It cannot be combined, on the same costs, with other State aid, de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) aid included.
- It can be combined with support that is not State aid, provided the total does not exceed the eligible cost.
- The ban on double funding of the same costs that applies to recovery plan funds holds here too.
How to apply
- 1Applications closed. No new applications can be filed since 10 November 2025. Applications were filed online only, on the platform of Invitalia, which runs the measure.
- 2If you have already applied. Check your position in the rankings published on the MIMIT website and follow Invitalia's instructions.
Mistakes that cost you the benefit
- Adding this grant to other State aid, de minimis (The European rule that caps the total «minor» public aid a business can receive over three years.) included, on the same costs.
ClosedTax reliefTransizione 5.0 tax credit (2024-2025)
It is closed: it covered investments from 1 January 2024 to 31 December 2025, and on 6 November 2025 the MIMIT announced that the funds had run out. For new solar PV systems in businesses the measure today is enhanced depreciation. Those left out for lack of funds have a separate route: for solar PV and storage, a MIMIT grant, no longer the credit.Worth: Closed. For those left out: 89.77% of the credit on 4.0 assets, a separate grant for the solar PVCloses: 31 December 2025Show the details
Applications are closed. The residual credit at 89.77% is used on an F24 form by 31 December 2026; the grant for the solar PV is spread over 2026, 2027 and 2028.
Who can claim it
- New applications can no longer be filed: the deadlines have passed.
- Businesses that sent the completion report and received confirmation from the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) that the investment is technically eligible, but were left out because the funds ran out.
Who is excluded
- Anyone who did not file the reports on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) platform by the end of 2025.
- Investments made from 1 January 2026: enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) applies to those.
How much it is worth
- Businesses left out because the funds ran out: a tax credit equal to 89.77% of the one claimed, but only for 4.0 assets (annexes A and B to law 232/2016) and for staff training. It must be used on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form by 31 December 2026, tax code 7079.
- For the solar PV and storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) part of those same businesses the credit no longer exists: in its place there is a MIMIT grant, in proportion to the spending on systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), storage and certifications. Funds: 57.7 million euros for 2026, 80 million for 2027, 60 million for 2028.
- The grant for the solar PV cannot exceed the credit that had been claimed for the same costs, and it is not taxed.
- How it worked: a credit of 35% to 45% up to 10 million euros of investment, depending on the energy saving achieved.
Eligible costs
- For the residual credit at 89.77%: only tangible and intangible 4.0 assets and staff training.
- For the MIMIT grant: systems generating renewable electricity for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.), and the costs of the accounting, energy-saving and DNSH (Do No Significant Harm to the environment) certifications.
Requirements for solar PV
- The grant covers only businesses that already had a Transizione 5.0 project judged technically eligible by the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.).
- The system must comply with the DNSH principle.
Combining it with other incentives
- The Transizione 5.0 credit cannot be combined with the Transizione 4.0 credit on the same assets.
- With the ZES unica credit the 2025 budget act allowed combination, provided the two forms of aid do not cover the same shares of the cost.
How to apply
- 1Check the GSE platform. If you had an eligible project, from 29 April 2026 you will find the receipt with the confirmed credit in your file on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Transizione 5.0 platform, with a notice by certified email and email.
- 2Use the credit by the end of 2026. The credit at 89.77% is offset on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form by 31 December 2026 with tax code 7079.
- 3Grant for the solar PV. It is paid by the MIMIT on the basis of the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s information on the spending incurred, in the manner set by a ministerial decree: follow the notices published on the MIMIT website.
Documents
- Keep the certifications, sworn reports, invoices and delivery notes for the eligible assets for inspections.
- Tell the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) about sales of the assets, moves to other premises or a lease not exercised within the five years after completion.
Mistakes that cost you the benefit
- Thinking you can still book Transizione 5.0 for a new system: for investments from 2026 there is enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.).
- Letting the credit at 89.77% lapse: after 31 December 2026 it can no longer be offset.
Official sources
- MIMIT — Pagina «Piano Transizione 5.0»: chiusura, decreto direttoriale 6 novembre 2025 (esaurimento risorse), ultima modifica 30 giugno 2026
- MIMIT — Avviso 29 aprile 2026: credito all'89,77%, uso entro il 31 dicembre 2026, codice tributo 7079
- Normattiva — D.L. 27 marzo 2026, n. 38, art. 8, commi 1, 3 e 3-bis (testo vigente)
- GSE — Pagina Transizione 5.0: risorse esaurite
Checked on 19 November 2026
What this means for your sector
For industry the incentives are the same as for other businesses: what changes is consumption and scale. A plant uses a lot of energy and uses it steadily, often during the day: that is the profile where the energy produced is used on site and the incentive pays off most.
The limit that matters is the one in enhanced depreciation: the system may produce at most 105% of the production facility's energy needs, calculated on the previous year's consumption. Those needs also include gas or other fuels used for process heat, converted with the formulas in the decree: for anyone electrifying ovens or steam, the ceiling rises.
Above 2.5 million euros of investment the uplift falls to 100% and then to 50%: it is worth knowing which band the project falls into before deciding its size.
If the plant is in the South or in a simplified logistics zone you can consider the ZES or ZLS tax credit, which however does not deal specifically with a solar PV system on its own and can be added to enhanced depreciation only on different shares of the cost.
The national non-repayable grants for solar PV in businesses are closed as at 19 November 2026. Check the regional grants page: some Regions have open calls.
Frequently asked questions
What is the main incentive today for solar PV in my business?
Enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.): the cost of a system for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.) is uplifted by 180% on the portion up to 2.5 million euros, if the system is completed by 30 September 2028 and uses modules listed in sections b) or c) of the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.). It is a deduction from income tax, not a credit to use on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form.
Can I add several incentives on the same system?
It depends on the incentives. Enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) can be added to other aid on the same costs provided they do not cover the same share of the cost and the total does not exceed the spend; the uplift is calculated net of any grants received. Some non-repayable (A grant that does not have to be paid back.) calls, on the other hand, forbid any combination with other State aid. Every entry has a «Combining it with other incentives» section with the rule as read on the source.
My business is in the South: can I get the ZES tax credit?
The ZES unica credit reaches 70% for small businesses in the Puglia areas covered by the Just Transition Fund, and lower percentages elsewhere; the actual percentage is set by the Agenzia delle Entrate once it has counted the applications. No official document deals specifically with a project made up of the solar PV system alone: ask for confirmation before ordering.
What happens to the energy I do not use?
You feed it into the grid and sell it to the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) under Ritiro Dedicato (The GSE scheme that buys the energy you feed into the grid and do not consume.), at the market price for your zone. Scambio sul Posto is no longer available for new systems. If you take part in an energy community (Comunita energetica rinnovabile, a renewable energy community: citizens, businesses and public bodies that share the energy produced by nearby systems and receive an incentive on the shared energy.), you also receive the premium tariff on the shared energy for 20 years.
Can I finance the system with Nuova Sabatini?
Only under certain conditions: SMEs that do not produce energy and are not farms can finance a solar PV system only if it is part of a wider investment programme consistent with their business. The loan runs from 20,000 euros to 4 million euros, over 5 years, with a Ministry grant towards the interest.
Are there regional calls for my business?
It depends on the region and on the moment: many calls open and close within a few weeks. On the Regional grants page you will find, region by region, the calls open, coming and closed over the last twelve months, with a link to the Region's official page.
Updates
Enhanced depreciation: the GSE portal has opened for reporting completed investments.
The GSE window for the grant for solar PV in southern businesses (PN RIC) has closed.
Enhanced depreciation: the GSE booking platform has opened.
Related pages
- Apartment buildings5 openupd. 19 November 2026
- Public bodies2 openupd. 19 November 2026
- Retail and hospitality7 openupd. 19 November 2026
- Agriculture3 openupd. 19 November 2026
- Logistics and warehouses6 openupd. 19 November 2026
- Tax credit3 openupd. 19 November 2026
- Enhanced depreciation1 openupd. 19 November 2026
- Regional grants7 openupd. 19 November 2026
Work out what your plant gets back
Sofia sizes the system around your consumption, applies the incentives you are entitled to and puts you in touch with 2-3 installers. Free of charge.
The information on this page is guidance, current at the date shown and based on the official sources cited. It does not replace the opinion of an accountant or an adviser: before committing to an investment, check your own case with a professional.