Enhanced depreciation for solar PV in businesses
If your business installs a solar PV system for self-consumption, it can deduct from income tax 180% more than the cost, on the portion up to 2.5 million euros. The system must be completed between 1 January 2026 and 30 September 2028, it cannot exceed 105% of your consumption, and the paperwork goes through three reports to the GSE.
Updated on official sources checked
1
incentive open today
30 September 2028
next deadline: Enhanced depreciation 2026-2028
180%
uplift on the cost, up to 2.5 million euros
2 of 2
entries checked against official sources
All the incentives at a glance
Each row takes you to its section. Greyed-out entries are being checked: we show what is missing and no figures.
2 incentives shown
| Incentive | Who can claim it | How much | Closes | Status |
|---|---|---|---|---|
| Enhanced depreciation 2026-2028 (Nuovo Piano Transizione 5.0) | Businesses with business income | 180% of the cost up to 2.5 million euros | 30 September 2028 | Open |
| Transizione 5.0 tax credit (2024-2025) | Only businesses that already applied by the end of 2025 | Closed. For those left out: 89.77% of the credit on 4.0 assets, a separate grant for the solar PV | 31 December 2025 | Closed |
The incentives in detail
Open an entry for requirements, steps, documents and mistakes to avoid. Every entry carries its official sources at the end.
OpenTax reliefEnhanced depreciation 2026-2028 (Nuovo Piano Transizione 5.0)
You can deduct from income tax more than you spent: the cost of a solar PV system for self-consumption is uplifted by 180% on the portion up to 2.5 million euros. It applies to systems completed between 1 January 2026 and 30 September 2028.Worth: 180% of the cost up to 2.5 million eurosCloses: 30 September 2028Show the details
System completed (work finished) by 30 September 2028; completion report by 15 November 2028.
Who can claim it
- Anyone with business income who invests in assets used in production facilities (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in Italy: resident businesses and permanent establishments of foreign businesses, whatever their legal form, sector or size.
- Farms: what counts is how you determine your income. The law refers to «persons with business income»; those who cannot use enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) have a dedicated agricultural tax credit (see the Agriculture page).
Who is excluded
- Businesses in voluntary liquidation, bankruptcy, compulsory administrative liquidation, composition with creditors without business continuity or any other insolvency procedure, even where it is only being declared.
- Businesses subject to disqualifying sanctions (legislative decree 231/2001).
- For those who qualify, the benefit applies only if they comply with workplace safety rules and pay their employees' social contributions correctly.
How much it is worth
- 180% on the portion of the investment up to 2.5 million euros.
- 100% on the portion above 2.5 and up to 10 million euros.
- 50% on the portion above 10 and up to 20 million euros.
- It is not a tax credit to be used on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form: it is an extra (off-book) deduction on depreciation charges (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) or lease instalments, which reduces the taxable base for income tax only.
- The benefit starts from the tax year in which you file the completion report with the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.), if the system entered service in that same year and after the GSE checks have come back positive.
Eligible costs
- The electricity generating units (modules and system components).
- The transformers upstream of the grid connection point and the meters for the energy produced.
- The system's auxiliary services.
- The storage system (Batteries that store the energy produced during the day so you can use it when the system is not producing.) connected to the installation, up to a ceiling: 2 times the eligible value of the system up to 20 kW, 1.5 times up to 600 kW, 1.2 times up to 1,000 kW, 1 time above that.
- Each system has a maximum eligible cost, set by the decree by size and by module type (Annex 1): spending above that ceiling is not uplifted.
Requirements for solar PV
- The energy produced must serve the business's own consumption, including at a distance.
- The system may produce at most 105% of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s energy needs, calculated on the average annual consumption of the previous year. Those needs also include gas or other fuels used for heat, converted with the formulas in the decree.
- The system stands on the same land-registry parcels as the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.), or on different parcels if it is connected to the grid through an existing POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.) (the code of the delivery point) of the same facility.
- Modules: for solar, only systems with modules listed in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) of photovoltaic technologies, section b) or section c), qualify (article 12 of decree-law 181/2023). The GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) platform only provides these two fields.
- Section b): modules with cells made in the European Union, with cell efficiency of at least 23.5%. Section c): modules made in the European Union with bifacial heterojunction or tandem cells made in the European Union, with cell efficiency of at least 24.0%.
Combining it with other incentives
- You can add it to other national or European incentives on the same costs, provided the support does not cover the same shares of the cost and the total does not exceed the cost incurred.
- The uplift is calculated on the cost net of other grants received for the same costs: for example, if a regional call covers part of the spend, the 180% applies only to the rest.
- It does not apply to investments using the deduction in article 1, paragraph 446, of law 207/2024.
- Text read in the original version of the law in the Official Gazette: later amendments (decree-law 38/2026) are being checked.
How to apply
- 1Get your consumption figures ready. Collect the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s electricity (and heat) consumption for the previous year and the POD (Point of Delivery: the code that identifies the point where you draw energy from the grid. You find it on your bill.): they are needed to show that the system does not exceed 105% of the facility's needs.
- 2Advance report. On the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s «Nuovo Piano Transizione 5.0» portal (Customer Area, with SPID or CIE) you book the benefit: details of the business and of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.), the expected amount, the expected dates for finishing the work and entering service. The platform has been open since 12 June 2026.
- 3Confirmation report. Within 60 days of a positive outcome on the advance report you confirm the investment, with the date and amount of the payment that brings the down payment to at least 20% of the cost of each asset, and the invoice details. You cannot add assets and the costs can only go down.
- 4Completion report. Once the system is in service, and in any case by 15 November 2028, you file the completion report with the invoices and declare that you hold the sworn technical report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.) and the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.).
- 5Annual reports. From the first report and for as long as the benefit lasts: a periodic report by 20 January each year, and by 30 June the supplement with the depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) schedule.
Documents
- Annual electricity consumption (and any heat consumption) of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.) in the previous year.
- Invoices for the eligible costs and proof of payment of the down payment of at least 20%.
- A sworn technical report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.) by an engineer or industrial surveyor on the professional register, or a certificate from an accredited certification body.
- Accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.) by a statutory auditor (including for businesses not required to have an audit).
- Registration of the modules in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) (section b or c).
- The lease contract and the purchase order, if the system is on a finance lease.
Mistakes that cost you the benefit
- Counting on the 180% for the part of the spend already covered by a grant: the uplift is calculated net of other grants on the same costs.
- Sizing the system above 105% of your needs: the excess part does not qualify.
- Ordering modules not listed in sections b) or c) of the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.).
- Missing a deadline (60 days for the confirmation, 10 days for supplements, 15 November 2028 for the completion): the benefit is lost.
- Thinking it is a credit to offset on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form: it is a deduction from income tax, and you need taxable profits.
- Selling the system or moving it abroad during the depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) period without replacing it with a similar asset: the benefit is forfeited.
- Not keeping the sworn report (A report signed by an engineer or surveyor on the professional register, who swears under their own responsibility that the system meets the requirements.), the accounting certification (A statutory auditor's certificate that the costs were actually incurred and match the accounts.), the invoices and the delivery notes for inspections.
Example: on an investment of 100,000 euros
A solar PV system for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), completed in 2027, with an eligible cost of 100,000 euros. With the 180% uplift the business deducts 280,000 euros in all instead of 100,000, spread over the years of depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.). The real saving is the extra deduction multiplied by the income tax rate you pay: work it out with your accountant.
| Eligible cost | 100,000 euros |
|---|---|
| 180% uplift | +180,000 euros |
| Total deductible | 280,000 euros |
| On 3,000,000 euros | +4,500,000 (180% on 2.5 million) +500,000 (100% on 0.5 million) |
Official sources
- Gazzetta Ufficiale — Legge 30 dicembre 2025, n. 199, art. 1, commi 427, 428, 429 e 431 (testo originario)
- MIMIT — Scheda «Nuovo Piano Transizione 5.0 - Iperammortamento», aggiornata al 15 ottobre 2026
- GSE — Nuovo Piano Transizione 5.0: chi può accedere, calcolo del beneficio, come accedere
- MIMIT-MEF — Decreto interministeriale 7 maggio 2026, artt. 3, 4, 6, 7, 8, 10 e Allegato 1
- GSE — Guida all'utilizzo della piattaforma NPTR5 (15 ottobre 2026), sezione impianti FER
- Normattiva — Decreto-legge 9 dicembre 2023, n. 181, art. 12, comma 1 (Registro ENEA dei moduli)
Checked on 19 November 2026
ClosedTax reliefTransizione 5.0 tax credit (2024-2025)
It is closed: it covered investments from 1 January 2024 to 31 December 2025, and on 6 November 2025 the MIMIT announced that the funds had run out. For new solar PV systems in businesses the measure today is enhanced depreciation. Those left out for lack of funds have a separate route: for solar PV and storage, a MIMIT grant, no longer the credit.Worth: Closed. For those left out: 89.77% of the credit on 4.0 assets, a separate grant for the solar PVCloses: 31 December 2025Show the details
Applications are closed. The residual credit at 89.77% is used on an F24 form by 31 December 2026; the grant for the solar PV is spread over 2026, 2027 and 2028.
Who can claim it
- New applications can no longer be filed: the deadlines have passed.
- Businesses that sent the completion report and received confirmation from the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) that the investment is technically eligible, but were left out because the funds ran out.
Who is excluded
- Anyone who did not file the reports on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) platform by the end of 2025.
- Investments made from 1 January 2026: enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) applies to those.
How much it is worth
- Businesses left out because the funds ran out: a tax credit equal to 89.77% of the one claimed, but only for 4.0 assets (annexes A and B to law 232/2016) and for staff training. It must be used on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form by 31 December 2026, tax code 7079.
- For the solar PV and storage (Batteries that store the energy produced during the day so you can use it when the system is not producing.) part of those same businesses the credit no longer exists: in its place there is a MIMIT grant, in proportion to the spending on systems for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), storage and certifications. Funds: 57.7 million euros for 2026, 80 million for 2027, 60 million for 2028.
- The grant for the solar PV cannot exceed the credit that had been claimed for the same costs, and it is not taxed.
- How it worked: a credit of 35% to 45% up to 10 million euros of investment, depending on the energy saving achieved.
Eligible costs
- For the residual credit at 89.77%: only tangible and intangible 4.0 assets and staff training.
- For the MIMIT grant: systems generating renewable electricity for self-consumption (The energy the system produces and you use on site, instead of feeding it into the grid.), storage systems (Batteries that store the energy produced during the day so you can use it when the system is not producing.), and the costs of the accounting, energy-saving and DNSH (Do No Significant Harm to the environment) certifications.
Requirements for solar PV
- The grant covers only businesses that already had a Transizione 5.0 project judged technically eligible by the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.).
- The system must comply with the DNSH principle.
Combining it with other incentives
- The Transizione 5.0 credit cannot be combined with the Transizione 4.0 credit on the same assets.
- With the ZES unica credit the 2025 budget act allowed combination, provided the two forms of aid do not cover the same shares of the cost.
How to apply
- 1Check the GSE platform. If you had an eligible project, from 29 April 2026 you will find the receipt with the confirmed credit in your file on the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s Transizione 5.0 platform, with a notice by certified email and email.
- 2Use the credit by the end of 2026. The credit at 89.77% is offset on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form by 31 December 2026 with tax code 7079.
- 3Grant for the solar PV. It is paid by the MIMIT on the basis of the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.)'s information on the spending incurred, in the manner set by a ministerial decree: follow the notices published on the MIMIT website.
Documents
- Keep the certifications, sworn reports, invoices and delivery notes for the eligible assets for inspections.
- Tell the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) about sales of the assets, moves to other premises or a lease not exercised within the five years after completion.
Mistakes that cost you the benefit
- Thinking you can still book Transizione 5.0 for a new system: for investments from 2026 there is enhanced depreciation (The way the cost of a long-lived asset is deducted a little each year, over its useful life.).
- Letting the credit at 89.77% lapse: after 31 December 2026 it can no longer be offset.
Official sources
- MIMIT — Pagina «Piano Transizione 5.0»: chiusura, decreto direttoriale 6 novembre 2025 (esaurimento risorse), ultima modifica 30 giugno 2026
- MIMIT — Avviso 29 aprile 2026: credito all'89,77%, uso entro il 31 dicembre 2026, codice tributo 7079
- Normattiva — D.L. 27 marzo 2026, n. 38, art. 8, commi 1, 3 e 3-bis (testo vigente)
- GSE — Pagina Transizione 5.0: risorse esaurite
Checked on 19 November 2026
Which sectors it applies to
- Manufacturing
The typical case: high, steady consumption, wide roofs, large systems. The 105% ceiling rarely holds industry back.
- Logistics and warehouses
It applies as it does to any business. Note: the 105% ceiling is calculated on the production facility's consumption, not on the roof area available.
- Retail and hospitality
Shops, hotels and restaurants are businesses and can use it. The benefit shows if the business has taxable profits, because it is a deduction, not a credit.
- Agriculture
It goes only to those with business income. Farms that cannot use it have a dedicated agricultural tax credit: you will find it all on the Agriculture page.
Frequently asked questions
Is enhanced depreciation a tax credit?
No. It is an uplift on the cost that allows higher depreciation charges (The way the cost of a long-lived asset is deducted a little each year, over its useful life.) and reduces taxable income. It cannot be offset on an F24 (The form used to pay taxes and social contributions; tax credits are used here to reduce what you pay.) form, so you need taxable profits to benefit from it.
How much is it worth for a solar PV system?
The eligible cost is uplifted by 180% on the portion of the investment up to 2.5 million euros, by 100% between 2.5 and 10 million and by 50% between 10 and 20 million. On an investment of 100,000 euros you deduct 280,000 euros in total.
Can I build a system bigger than my consumption?
Yes, but only the part producing up to 105% of the production facility (The company's plant or site: one or more local units on the same land-registry parcel or on neighbouring parcels.)'s energy needs is eligible. Those needs are calculated on the average annual consumption of the previous year, including thermal energy converted with the formulas in the decree.
Which photovoltaic modules do I have to use?
On the GSE (Gestore dei Servizi Energetici: the state-owned company that runs most of the incentives for renewables.) platform the cost of the modules can only be declared for modules listed in the ENEA Register (A public list of photovoltaic modules made in the European Union that meet minimum efficiency requirements.) under sections b) or c): European modules with high-efficiency cells. Ask the installer for the registration certificate before ordering.
Does storage qualify too?
Yes, if it is connected to the system, up to a ceiling proportional to the value of the system: 2 times up to 20 kW, 1.5 times up to 600 kW, 1.2 times up to 1,000 kW, 1 time above that.
By when do I have to do everything?
The system must be completed (work finished) by 30 September 2028 and the completion report must be filed by 15 November 2028. The confirmation report must be filed within 60 days of a positive outcome on the advance report.
Can I add it to a regional grant or to the ZES credit?
Yes, on the same costs, provided the two forms of aid do not cover the same share of the cost and the total does not exceed the spend. The uplift is calculated on the cost net of any grants received: if a call covers part of the spend, the 180% applies only to the rest.
Updates
The GSE portal has opened for reporting completed investments.
Confirmation reports have opened, with a down payment of at least 20% of the cost of each asset.
The GSE booking platform has opened (advance report).
The interministerial decree with the implementing rules has been signed.
Related pages
- Apartment buildings5 openupd. 19 November 2026
- Public bodies2 openupd. 19 November 2026
- Retail and hospitality7 openupd. 19 November 2026
- Agriculture3 openupd. 19 November 2026
- Manufacturing6 openupd. 19 November 2026
- Logistics and warehouses6 openupd. 19 November 2026
- Tax credit3 openupd. 19 November 2026
- Regional grants7 openupd. 19 November 2026
Work out what enhanced depreciation gives you back
Sofia sizes the system around your consumption, applies the incentives you are entitled to and puts you in touch with 2-3 installers. Free of charge.
The information on this page is guidance, current at the date shown and based on the official sources cited. It does not replace the opinion of an accountant or an adviser: before committing to an investment, check your own case with a professional.